Area Planning Manager

Area Planning Manager, Energy China HPCC, MBR Solar project - Phase 4

START Date: 
April, 2020
  • Prepare construction program of works related to Civil /Structural/ID /MEP / Firefighting & Fire alarm/ELV discipline wise detailed man-hours , cash flow, dashboards, s-curves using Primavera P6 & MS Project and ensure that the Project Plan reflects the project scope and is fully resourced and cost loaded in reference to the BOQ and Engineering drawings issued for site construction.
  • Prepare Revised Program for the remaining works and recovery program.
  • Check and Update program of works as required for the project through close out, integrating contractor and prog
Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Forensic Analysis): 
4000

Area Planning Manager, FCB Fives, Cement Plant

START Date: 
March, 2017
END Date: 
June, 2019

Responsable Planning 

Projet : Construction of a cement Plant in CHelf 

Client : ECDE 

Location : Algeria

Area Planning Manager, Weerasooriya Builders (Pvt) Ltd, Building, roads, Bridges & Infrastructure and High rise Building

START Date: 
June, 2011
END Date: 
April, 2018
  • Coordinates construction planning, schedule, budget cost analysis and technical submittals of the projects
  • Coordinates material, tools and equipment and ensure the delivery within the baseline program.
  • Coordinate with the project manager the developments of contract and baseline program Monitor and update actual project status with the target or baseline program and regularly update the project manager regarding project progress
  • Supervise and preparation of periodic billings and invoices up to approval of clients and ensure timely submissi
Experience Hours (Planning & Scheduling): 
2400
Experience Hours (Cost Management): 
2450
Experience Hours (Forensic Analysis): 
900

Area Planning Manager, ACE Consulting Engineers Moharram - Bakhoum, oriana 2 villas

START Date: 
January, 2018

Direct responsibility for the development of the master schedule for the project and in particular the development and monitoring of critical milestone schedules. 
Identification of all critical actions required by other parties in order to mainta

Area Planning Manager, Wates Construction, (various projects) @ all UK

START Date: 
September, 2017

Planning Manager - head of planning in Business Unit, working on tenders and live construction projects including education, offices, leisure, public sector and residential projects.  Covering South West England.

Area Planning Manager, Bouygues UK Ltd, (various projects) @ all UK

START Date: 
January, 2014
END Date: 
January, 2016

Planning Manager - managing a team of 5 planners, working on tenders & live construction projects, including residential, commenrcial, leisure and defence projects in south east UK.

Area Planning Manager, Transnet Port Terminal, 1. Road Rehabiliation project; 2. Truck staging; 3. 3rd Tipple installation - RBY; 4. Additional Tippler Installation - SLD; 5. Canteen Construction - Maydon Wharf; 7. PE Manganese Refurbishment Pahse 1;

START Date: 
January, 2015

Project Scope and Time Management

 Utilising Project Life-Cycle Project (PLP) and the integrated Capital Projects Assurance Framework (ICPAF) to:

- Collect requirements

- Identify business needs and reqwuirements

- Determining durations

- Determining Resources

- Creating Work Breakdown Structures (WBS) and Cost Breakdown Structures (CBS)

- Acquire scope freeze date approval

- Sequencing and linking activities

- Creating project schedule

- Performing Critical Path Analysis, including resource loading and smooting.

Experience Hours (Planning & Scheduling): 
5200
Experience Hours (Cost Management): 
5200
Experience Hours (Forensic Analysis): 
0

Area Planning Manager, CEGELEC (VINCI), Power Generation

START Date: 
September, 2013
END Date: 
July, 2014

-        Develop and maintain master baseline schedule

-        Set up  Project Control procedures

-        Set up Progress measurement system

-        Schedule update in weekly and monthly basis

Experience Hours (Planning & Scheduling): 
1600
Experience Hours (Forensic Analysis): 
400

Area Planning Manager, Sir Robert McAlpine Limited, Major Civils & Multi Discipinary

START Date: 
May, 1982
END Date: 
May, 1996

Planning and Controls Manager @ Sir Robert McAlpine

Planning

Scheduling

Organising

Reporting

Assisting with training new staff including providing process's and procedures

Experience Hours (Planning & Scheduling): 
20000

Area Planning Manager, MWH Global, Multiple Water Programmes

START Date: 
July, 2004
END Date: 
January, 2010

MWH Planning Manager from 2004 for UU AMP3 to Project Control Manager over all the UK Capital programmes

Experience Hours (Planning & Scheduling): 
6500
Experience Hours (Cost Management): 
3000