PREMIER OIL

EPC Lead Planner, PREMIER OIL, Solan

START Date: 
March, 2014
END Date: 
September, 2014
Solan project. Construction of the jacket and the topside at the Bifab yard. Managed the Jacket construction planning scope • Provided new detailed estimation tools of the Load-out planned date, using production daily results (bracers and infills installed/welded out). • Optimized the schedule of the Rigging contractor and its interactions with production. Directed a team of 2 production planners • Trained the team to become proficient with Primavera P6. • Supported production team by identifying daily priorities and critical path. • Delivered daily production reports.

Senior Planning Engineer, PREMIER OIL, Sea Lion Project

START Date: 
January, 2014

Senior Planning Engineer Sea Lion Project.Full offshore field development, currently entering FEED phase of project. Proposed Tension Leg Platform (TLP) with Topsides dry weight of 21,000 tonnes, subsurface development design accommodating reservoir characteristics. As the Senior Planning Engineer for Premier Oil I am responsible for measurement and collation of the entire Field Development Plan together with schedules and estimates relating to future Hook-up, Commissioning and Maintenance of the facilities.

Jon Ward

First Name: 
Jon
Last Name: 
Ward
Four (4) year apprenticeship served as a Mechanical Engineer (awarded East of England Apprentice of the Year 1996).  Higher education followed by ten (12) years experience in the Oil and Gas Industry predominantly within Project Controls, experience within project specification, design, execution, start up and close-out of major Greenfield and Brownfield modifications projects.
Professional Since: 
Jan-2002 (22.9 yrs experience)
Oldest experience: 
Jan 1994 (30.9 yrs experience, WARNING: 8.0 years variance with Professional Since)
Years Experience: 
20

Senior Planning Engineer, PREMIER OIL, Facilities Engineering

START Date: 
April, 2011
END Date: 
May, 2011

Part of Facilities Engineering Team and responsible for planning, scheduling, and control of all projects.

Temporary handle Phase 4 Project

PREMIER OIL Planner

START Date: 
April, 2008
Current Role

frank pye

First Name: 
frank
Last Name: 
pye
Professional Since: 
Nov-1988 (36.0 yrs experience)
Oldest experience: 
Apr 2008 (16.6 yrs experience, WARNING: 19.4 years variance with Professional Since)
Years Experience: 
0