Tecnimont

Francesco Finistauri

First Name: 
Francesco
Last Name: 
Finistauri
Professional Since: 
Oct-2000 (24.1 yrs experience)
Oldest experience: 
Oct 2000 (24.2 yrs experience, WARNING: 0.1 years variance with Professional Since)
Years Experience: 
8

Site Planner Coordinator, Tecnimont, LDPE Polyethylene Plant

START Date: 
December, 2007
END Date: 
November, 2009

Scope of work:

Construction of a 350 kton/a Polyethylene plant in Stenungsund (Sweden). The Plant is an expansion of the existing operative plant. The scope includes ISBL and OSBL works, including silos and revamping of packaging stations, process control systems, raw materials, utility and connections at tie-in points.

Senior Planner, Tecnimont, New Propane Dehydrogenation (PDH) Plant

START Date: 
December, 2009

Scope of work:

To build a Propane Dehydrogenation (PDH) Unit with design production capacity of 510.000 MTPY of propylene based on the UOP “Oleflex” Propane Dehydrogenation technology. The scope of works consists in Detail Design, Engineering, Construction and Pre-commissioning services activities.

Fabrizio Paolo Lo Iacono

First Name: 
Fabrizio Paolo
Last Name: 
Lo Iacono
Professional Since: 
Mar-2006 (18.7 yrs experience)
Oldest experience: 
Sep 2008 (16.2 yrs experience, WARNING: 2.5 years variance with Professional Since)
Years Experience: 
2

Nagendra Kumar Revuru

First Name: 
Nagendra Kumar
Last Name: 
Revuru
 
Professional Since: 
Oct-1993 (31.1 yrs experience)
Oldest experience: 
Dec 2003 (21.0 yrs experience, WARNING: 10.1 years variance with Professional Since)
Years Experience: 
6

Sayed Adil Abbas

First Name: 
Sayed
Last Name: 
Adil Abbas
Professional Since: 
Feb-2008 (16.8 yrs experience)
Oldest experience: 
Jul 2003 (21.4 yrs experience, WARNING: 4.6 years variance with Professional Since)
Years Experience: 
7

Srinivasan Ramasamy

First Name: 
Srinivasan
Last Name: 
Ramasamy
Professional Since: 
Oct-1999 (25.1 yrs experience)
Oldest experience: 
Jun 2003 (21.5 yrs experience, WARNING: 3.6 years variance with Professional Since)
Years Experience: 
7

Rajesh Chitnis

First Name: 
Rajesh
Last Name: 
Chitnis
Professional Since: 
Sep-2008 (16.2 yrs experience)
Oldest experience: 
Mar 2003 (21.7 yrs experience, WARNING: 5.5 years variance with Professional Since)
Years Experience: 
7

Tecnimont Planning Manager

START Date: 
January, 1998
END Date: 
April, 2004
Worked as Deputy Manager Project Controls on various Petrochemical and LNG projects in Milan Home office, Belgium and India sites

Tecnimont Project Controls Engineer

START Date: 
February, 2010
END Date: 
May, 2010
As Project Controls Site Cost Control at Tecnimont for QChem II Project, Mesaieed, Qatar (Polyethylene Derivatives Plant), specific duties and job responsibilities include:
– Prepare the Total Installed Cost (Asset Register) by supply cost, overhead cost, erection/ installation cost and construction overhead to be provided to client as per the contract requirement and also for internal comparison with future project;
– Attend to pre-commissioning meetings as part of the integrated team for mechanical completion;
– Prepare the Pre-commissioning Daily Activity Report;