LDPE Polyethylene Plant

ANALYST / PLANNING ENGINEER, Toyo Thai co.,ltd, LDPE Polyethylene Plant,

START Date: 
October, 2007
END Date: 
April, 2012

2010 to 2012 Planning Engineer Toyo-Thai Corp.,Ltd ,
Vinythai Windmill ABT Project, Rayong Thailand
2007 to 2010 Project control Toyo-Thai Corp.,Ltd
 PTT - PTTPE –LDPE Project, Rayong Thailand

• Developing and updating the EPC schedule by using Primavera Project Planner P5.
• Developing detailed schedules and issuance (Three Weeks Look Ahead schedules, 90 days look Ahead Schedules).
• Responsible in Project planner team for detailed and control schedule as per target on Shut down and Turnaround work.

Experience Hours (Planning & Scheduling): 
12000

Planning Engineer, Balfour Kilpatrick, LDPE Polyethylene Plant

START Date: 
November, 2007
END Date: 
August, 2008

Reporting to the Project Manager, producing and monitoring logic linked programmes coving all stages of the project from enabling works through construction, commissioning and project completion

Site Planner Coordinator, Tecnimont, LDPE Polyethylene Plant

START Date: 
December, 2007
END Date: 
November, 2009

Scope of work:

Construction of a 350 kton/a Polyethylene plant in Stenungsund (Sweden). The Plant is an expansion of the existing operative plant. The scope includes ISBL and OSBL works, including silos and revamping of packaging stations, process control systems, raw materials, utility and connections at tie-in points.