Project Controls Engineer

Project Controls Engineer, Parsons Corporation, Los Angeles Metro Red Line Subway

START Date: 
March, 1992
END Date: 
September, 1997

Los Angeles Metro Rail. (Five Years) Worked as a Claims Engineer and Project Controls Engineer on the Red Line Subway project. Analyzed claims valued at $13M on four subway station construction projects. Defended LACMTA in the dispute resolution process and argued disputes before the Disputes Review Board. Performed claim entitlement analysis, developed negotiation strategies, recommended settlements and prepared change orders for client approval. Reviewed and approved contractor submitted construction schedules and performed time-impact analyses for change orders.

Experience Hours (Planning & Scheduling): 
11950
Experience Hours (Cost Management): 
11950
Experience Hours (Forensic Analysis): 
4100

Project Controls Engineer, OGP Technical Services Sdb Bhd, EPCC of the Marine Terminal Offshore Facilities - Downstream

START Date: 
September, 2004
END Date: 
December, 2006

As Project Controls Engineer / Project Controls Engineer,  my job descriptions are the following:
● Provides comments and recommendations for planning, scheduling, and cost control requirements for the EPCC of the Marine Terminal Offshore Facilities - Downstream.
● Checks and reviews contractor’s interim progress certificates, direct payment requests to vendors, work change / variation orders.
● Evaluates and prepares slippage analysis to contractor’s Contract Execution Schedules and advice potential delays to Top Management on the First Oil Delivery date.

Experience Hours (Planning & Scheduling): 
4450
Experience Hours (Cost Management): 
4000

PROJECT CONTROLS ENGINEER, Fluor- Cnc , CHEVRON DIBI LONG, NAVGAS GAS PLANT, EXXON MOBIL INIM, TOTAL OML 99, TOTAL OML 100 ETC

START Date: 
March, 2004
END Date: 
August, 2011
  • Prepared a level 4 CPM schedule plus a comprehensive Basis of schedule document
  • Preparing level 4 Progress Measurement Matrix to calculate earned values Linked to the MDR
  • Reviewed Subcontractors calculation & schedule
  • Monitored weekly trends; SPI(t), CPI and to advise the project manager
  • Prepared weekly & Monthly report
  • Gave Project Controls advise as needed
  • Participated in weekly meetings with client
  • Re-forecasting planned Project Progress
  • Monitoring and controlling all contractors on the Project
  • Preparati

PROJECT CONTROLS ENGINEER, Fluor- Cnc , CHEVRON DIBI LONG, NAVGAS GAS PLANT, EXXON MOBIL INIM, TOTAL OML 99, TOTAL OML 100 ETC

START Date: 
March, 2004
END Date: 
August, 2011
  • Prepared a level 4 CPM schedule plus a comprehensive Basis of schedule document
  • Preparing level 4 Progress Measurement Matrix to calculate earned values Linked to the MDR
  • Reviewed Subcontractors calculation & schedule
  • Monitored weekly trends; SPI(t), CPI and to advise the project manager
  • Prepared weekly & Monthly report
  • Gave Project Controls advise as needed
  • Participated in weekly meetings with client
  • Re-forecasting planned Project Progress
  • Monitoring and controlling all contractors on the Project
  • Preparati

Project Controls Engineer, Saudi Pan Kingdom - SAPAC For Trad. Indus. & Cont. Co. LTD, Housing Project in King Khalid Military City, Infrastructure Works in Jeddah.

START Date: 
November, 2009

July 2009 – Present:

 

 

Planning & Contract Administration Engineer

Saudi Pan Kingdom for Contracting, Trading & Industry Pvt. Ltd. (SAPAC) Al-Ahsa Street, Malhaz,

Riyadh. Saudi Arabia

 

 

Project Controls Engineer, Saudi Pan Kingdom - SAPAC For Trad. Indus. & Cont. Co. LTD, Housing Project in King Khalid Military City, Infrastructure Works in Jeddah.

START Date: 
November, 2009

July 2009 – Present:

 

 

Planning & Contract Administration Engineer

Saudi Pan Kingdom for Contracting, Trading & Industry Pvt. Ltd. (SAPAC) Al-Ahsa Street, Malhaz,

Riyadh. Saudi Arabia

 

 

Project Controls Engineer, Saudi Pan Kingdom - SAPAC For Trad. Indus. & Cont. Co. LTD, Housing Project in King Khalid Military City, Infrastructure Works in Jeddah.

START Date: 
November, 2009

July 2009 – Present:

 

 

Planning & Contract Administration Engineer

Saudi Pan Kingdom for Contracting, Trading & Industry Pvt. Ltd. (SAPAC) Al-Ahsa Street, Malhaz,

Riyadh. Saudi Arabia

 

 

Project Controls Engineer, CH2M Hill VECO Engineering Abu Dhabi UAE, FEED for El M'Zaid Project Surface Facilities

START Date: 
August, 2013

Working as Project Controls Lead for the following projects:                  

                                   

1)     FEED for El M’Zaid Project Surface Facilities (Client: Groupement El M’Zaid (Sonatrach-CNPC), Algeria)

Project Controls Engineer, CH2M Hill VECO Engineering Abu Dhabi UAE, FEED for El M'Zaid Project Surface Facilities

START Date: 
August, 2013

Working as Project Controls Lead for the following projects:                  

                                   

1)     FEED for El M’Zaid Project Surface Facilities (Client: Groupement El M’Zaid (Sonatrach-CNPC), Algeria)

Project Controls Engineer, ARCONS, Alkhalij Power Plant - Sirt Libya

START Date: 
December, 2009
END Date: 
July, 2012

• Reviewing and studying contract agreement.
• Preparation of Method Statement for Erection of steel structure and tanks.
• Preparation of master and detailed project schedule (Primavera P6).
• Updating and follow up project schedule.
• Preparation of Daily, Weekly & Monthly Progress Reports.
• Preparation and follow up Material Control System.
• Control and follow up of monthly payments.
• Coordination and control of all incoming and outgoing e-mails and letters from and to the client.