Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Project Planner

Project Planner, Wood Group, Core Projects

START Date: 
June, 2013

Project Planner in the Offshore Oil & Gas Field.  I use P6 and Oracle.

Project planner, Swepoint Management, AIS-GIS Substations

START Date: 
August, 2011

Consultant at Swepoint Management working for ABB Substations. Tracking progress and presenting relevant analyzis.

Project Planner, KLCC Projeks Services Sdn Bhd, Tower

START Date: 
February, 2005

More than 8 years experience in planning and scheduling and project management. Currently works as a project planner at KLCC Projeks Services Sdn Bhd.

project planner, Alstom (wuhan) Engineering Technology Co.Ltd , ND3+4/YJ3+4/FCG1+2/FQ3+4/HYH1+2/HYH3+4/ND1+2/YJ1+2/Batic1+2/Taishan CI&EP project

START Date: 
March, 2011
END Date: 
June, 2013

 Main job responsibilities:

  1. Responsible for collecting information , tracking and updating the schedule ,reminding the risk and feedback the experience of project management .
  2. Responsible for establishing the TTS / OTS/ MTS/ STS and critical path , providing the SPI and S- curves and total float time .  (EPC)
  3. Responsible for analyzing the report with the actual situation of site to optimize the schedule , (PERT) (ES/EF/LS/LF/TF/FF/IF)
  4. Responsible for tending for nuclear product line (Po

project planner, Petrogas Jahan- Tehran, Iran , Bidboland II Refinery Project, Iran

START Date: 
May, 2011
END Date: 
December, 2012

·         Preparing BID schedules in alignment with our proposed construction technology, studying the project conditions and criteria to reflect in project schedules.

·         Developing project plan, tracking and updating the schedule with accurate data.

·          Preparing and distributing reports in timely manner.

Project Planner, Balfour Beatty Construction, SMAAH, SACRET HEART, ECLC

START Date: 
April, 2013

·         I created and maintained programme and projects plans across all phases of the project at SMAAH, Sacret Heart, and ECLC Project

·         I planned and allocated of project resources to work packages that lead to efficient resource optimization.

·         Establish Program schedules, track cost, and analyze earned value management data.

Project Planner, Balfour Beatty Construction, SMAAH, SACRET HEART, ECLC

START Date: 
April, 2013

·         I created and maintained programme and projects plans across all phases of the project at SMAAH, Sacret Heart, and ECLC Project

·         I planned and allocated of project resources to work packages that lead to efficient resource optimization.

·         Establish Program schedules, track cost, and analyze earned value management data.

Project Planner, FMC Technologies Konsberg Services, Laphroaig Drilling Campaign, Fettercairn Field drilling/abandonment Campaign, Spinnaker intervention Campaign

START Date: 
July, 2012
END Date: 
March, 2013

 

Responsible for all planning, scheduling and reporting functions associated with campaigns of drilling, completions, abandonment and interventions involving the following rigs/vessels of SEDCO 714, Skandi Constructor and the West Phoenix. I managed all customer/rental sub sea tooling through mobilisation/demobilisation, inspection/ refurbishment and all maintenance type activities across different campaigns.

Project Planner, Cosira Group, Medupi Power Station

START Date: 
November, 2012

Project Planner-Cosira (Medupi Power Station Project) (2012/11/5 – Current)

 

 Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Site Meetings And Start To Track Project
  • S-Curves and Histograms to know resources and time frame for the project to finish in time
  • Assist The Contracts Manager

Project Planner, Louwill Engineering/ Power Steel Construction, Steel Construction -Fabrication Of Steel, Erecting Of Steel , Building Of Headgears, Winder Houses , Re- Building Headgears

START Date: 
October, 2010
END Date: 
May, 2011

 

Project Planner  PowerSteel Constuction (2010/10/24 - 2011/05/31)

 

 Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design A Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting t

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content