SITE ENGINEER

Site Engineer, Mini Constructions, Construction of Multi Storied Buildings for Community development

START Date: 
December, 1999
END Date: 
April, 2001
  • As a site engineer directly involved in the supervision work, preparation of BBS, layout marking checking of Re-bar fixing, Staging, Alignment in all stages.
  • Involved in the planning of working schedule, procurement of material and management.
  • Deployment of equipments and manpower, checking of Sub Contractor bills keeping records & fully responsible for adherence to the quality control norms.
  • Quality Control, Timely Executions & Logistics of Suppliers and Sub Contractors.
  • Co-ordinate with consultant, Engineer-in-charge and preparation o

Site Engineer, Faber Maunsell AECOM, Channel Tunnel Rail Link (CTRL), Contract C310 - Thurrock Viaduct Construction

START Date: 
May, 2003
END Date: 
August, 2004

One of the engineering wonders of the £5.2bn project CTRL was completed in 2003, the Thurrock Viaduct, the link between the Thames tunnel and Rainham Marshes. Thurrock Viaduct is one of the most spectacular achievements of the CTRL, a new viaduct crossing over the existing railway lines, over the Dartford Tunnel exit ramps and underneath the Queen Elizabeth the 2nd Bridge. This 1 km long viaduct was constructed over a year.

SITE ENGINEER, Al Wafra Trading and Contracting, Construction of Residential Buildings

START Date: 
March, 2009
END Date: 
September, 2009

 

 

Al Wafra Trading & Contracting 

Company Branch

PO Box 10054Doha

State of Qatar

 

 

 

 

 

Civil Site Engineer /QA/QC

March 10, 2009

to

September 30, 2009

Site Engineer, Military Engineers, Long span steel structures

START Date: 
October, 2007
END Date: 
February, 2009

Site supervision activities and dealing with main contactor and other sub contractors 

SITE ENGINEER, Ramesh and Associates, Asphalt and Concrete roads., Highway Modificiation

START Date: 
December, 2000
END Date: 
January, 2003

Worked as Site Engineer for 

  • Modification of National highway in both Asphalt & Concrete road construction along with infrastructure works.
  • Road widening works of City roads.

Major Roles:

  • Site Coordination
  • Quality control checks
  • Monthly site Bill preparation (Valuation)
  • Resource managment

Site Engineer, P.C. Thomas & Co., Kochi, Kavarathi Stadium

START Date: 
June, 2001
END Date: 
April, 2002

• Execution of multi-storied building projects as per standards & technical specifications.

• Liaise with Consultant, Client, Subcontractors and Suppliers.

Site Engineer, Wade Adams Contracting LLC, Palm Island

START Date: 
May, 2002
END Date: 
May, 2005

• Project Planning & Scheduling using Primavera Project Planner Software.
• Update actual progress of the project to ensure that the project is within targeted
schedule.
• Report progress of the project to Management.
• Update manpower, plant & major material projections, from Internal Programme.
• Meet with Field Engineers regularly regarding work status, site delays and slippage of the
project and if necessary, inspect each project activities on process of construction to ensure that all works are done in accordance with the actual work schedule as reflected on

Site Engineer, Alex. Construction Company (A.C.C) - Talaat Mostafa - Egypt, Water Desalination planet - Montazah Center - Sharm El-sheikh, Egypt

START Date: 
October, 1996
END Date: 
July, 1999

Water Desalination planet - Montazah Center - Sharm El-sheikh, Egypt

Construction of "Water Desalination planet ", the skeleton of tow elevated tanks & 4 Underground tanks, the pump station, the infra-structural works, the Hardscape & Landscape Works & Internal and External Roads & Finishing Works and Handing over the Project.

Market Place