Design management/ co-ordination and design (preliminary, detailed and construction) of conversion of Oldham to Rochdale Line heavy rail stations to modular tram stops, responsible for:
Feasibility study for how step free access could be achieved at 35 stations spread over London, managed by six Train Operating Companies (TOCs). The work was commissioned to inform station prioritisation for funding from the Department for Transport (DfT).
Design Team Member for Form A production and advice to Thames Water on the submission of approval documents to Network Rail for repairs to a brick sewer passing beneath Banbury Station. Options considered included a pre-fabricated replacement section and re-lining of the existing sewer.
AECOM Deputy Project Manager for secondment of construction supervision staff. Responsibilities included maintenance of the projects electronic Project Management Plan and financial system.
AECOM Deputy Project Manager for production of deemed planning permission drawings for Transport and Works Order submission. Responsibilities include project quality management, setting up electronic data management system and monitoring production progress.
Lineside inspection of existing steel bridges for Kier Rail on TAH2 line in Walthamstow, to assess repair, strengthening and maintenance requirements as part of the 5 year framework agreement.