Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

PLANNING ENGINEER

PLANNING ENGINEER, Arabtec Construction L.L.C., Rayyan Plaza Hotel & Offices Complex (Twin Towers)

START Date: 
November, 2014
END Date: 
April, 2016

Planning Engineer at Arabtec Constructions WLL, Doha, Qatar

Experienced 2 projects:

Rayyan Plaza Hotel & Offices Complex (Twin Towers)

Al Waab Villas

Experience Hours (Planning & Scheduling): 
3700
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
100

Planning Engineer, Crossrail Ltd, Crossrail Limited London, UK - Canary Wharf Station

START Date: 
September, 2016
END Date: 
January, 2019
  • Support the Business in preparing periodic progress reporting of Level 1 and Level 2 schedules.
  • Support the project teams with all planning related activities associated with the management of their contracts and reporting requirements.
  • Participate and support the project teams in project and programme planning and progress meetings.
  • Identify and maintain programme / project milestone and schedule interface activities.
  • Planning, coordinating and establishing an interfae tracker that reflect the collaboration of the sta

PLANNING ENGINEER, Consolidated Contractor Company / HOCHTIEF Solutions Middle East Qatar W.L.L JV, Barwa Commercial Avenue

START Date: 
October, 2009
END Date: 
February, 2011
  • Overall planning and progress monitoring tasks.
  • Acting as a team leader for the progress monitoring team.
  • Preparation of company’s internal and client reports, charts, curves of weekly and monthly progress presentations.

Planning Engineer, Global Rail Construction, Numerous

START Date: 
March, 2010
END Date: 
March, 2011

Global Rail Construction Ltd

P6 Planning Engineer (Consultant)

 

Responsibilities:

Planning Engineer, Catalyst Viva Das, Building, Roads and Infrastructure

START Date: 
March, 2012

Prepare baseline loaded with cost and resources.

Prepare recovery in case of delays

Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
0

Planning Engineer, Gammon Construction Limited, LUCITE INTERNATIONAL, ALPHA 1 PROCESSING PLANT PROJECT , CONSTRUCTION of the ITE COLLEGE (WEST) PROJECT

START Date: 
October, 2007
END Date: 
February, 2010

·       Support for the Project Manager and other specialty engineers with coordination on project planning, scheduling and program controls

·       Analyze the baseline schedule, check links and critical path, comment on the suitability of the schedule, point out errors and oversights.

·       Tracking all activities on site

Planning Engineer, Pranavam constructions, EPC for Grasim VSF Plant

START Date: 
December, 2012
END Date: 
March, 2015

• Developing the Project Planning Package based on the client requirements which includes Work Breakdown Structure (WBS) and WBS Weightage, Baseline Schedu

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
7500
Experience Hours (Forensic Analysis): 
3800

Planning Engineer, Albanna Engineering, EPC for Construction of Diesel hydro-treating in BPCL

START Date: 
March, 2015
END Date: 
July, 2015

Preparing the planning package for the project which includes the Work Breakdown Structure and

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1200

Planning Engineer , Fortune Engineering and Energy services LLC, EPC for Modular Oil and Gas Skids for Saudi Aramco

START Date: 
July, 2015
END Date: 
December, 2017

Developing the Overall Project Planning Package based on the client requirements which includes Work Breakdown Structure (WBS) and Weightage of each WBS, Baseline Schedule in Primavera P6, Overall and Discipline wise “S” curves, Developing Overall Progress Measurement System(Automated System in excel), Engineering Drawing Deliverables Control Register(EDDR), Procurement and Manufacturing Status and Delivery log, Construction PMS, Manpower Histogram, Manpower loading, resource/commodity loading etc.

Experience Hours (Planning & Scheduling): 
6800
Experience Hours (Cost Management): 
5000
Experience Hours (Forensic Analysis): 
4400

Planning Engineer, SOIMI ABB Group, Eleme Petrochemical Complex

START Date: 
February, 1991
END Date: 
September, 1993

Major projects worked on:

Project: Eleme Petrochemical Complex

Location: Port Harcourt, NIGERIA

Polypropylene plant. Planning, productivity analysis and reporting in line with corporate procedures.

Project: Turn Around Maintenance - Kaduna Refinery

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content