PLANNING ENGINEER

Planning Engineer, Albanna Engineering, EPC for Construction of Diesel hydro-treating in BPCL

START Date: 
March, 2015
END Date: 
July, 2015

Preparing the planning package for the project which includes the Work Breakdown Structure and

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1200

Planning Engineer , Fortune Engineering and Energy services LLC, EPC for Modular Oil and Gas Skids for Saudi Aramco

START Date: 
July, 2015
END Date: 
December, 2017

Developing the Overall Project Planning Package based on the client requirements which includes Work Breakdown Structure (WBS) and Weightage of each WBS, Baseline Schedule in Primavera P6, Overall and Discipline wise “S” curves, Developing Overall Progress Measurement System(Automated System in excel), Engineering Drawing Deliverables Control Register(EDDR), Procurement and Manufacturing Status and Delivery log, Construction PMS, Manpower Histogram, Manpower loading, resource/commodity loading etc.

Experience Hours (Planning & Scheduling): 
6800
Experience Hours (Cost Management): 
5000
Experience Hours (Forensic Analysis): 
4400

Planning Engineer, SOIMI ABB Group, Eleme Petrochemical Complex

START Date: 
February, 1991
END Date: 
September, 1993

Major projects worked on:

Project: Eleme Petrochemical Complex

Location: Port Harcourt, NIGERIA

Polypropylene plant. Planning, productivity analysis and reporting in line with corporate procedures.

Project: Turn Around Maintenance - Kaduna Refinery

Planning Engineer, Fiatavio Foster Wheeler, Serene no. 8 Cogeneration Power Plants (no. 4 of 100 MW and no. 4 of 50 MW)

START Date: 
April, 1994
END Date: 
June, 1994

Recruited to assist in the programming and scheduling for the development of the Serene project, in which FiatAvio intends to build gas turbine based cogeneration systems to provide electric power and process steam to Fiat facilities located at various sites in Italy, mainly in the South.

Planning Engineer, ABB SAE Sadelmi, 380/132 kV Substation 9009

START Date: 
October, 1995
END Date: 
February, 1996
Responsible for planning and reporting on the 380/132 kV Substation 9009 project, consisting in 30 bays of 380 kV Gas Insulated Switchgear and 14 bays of 132 kV Gas Insulated Switchgear.

Planning Engineer, Turbotecnica, Nuovo Pignone Group, Cogeneration Power Plant CET3 - Electrical power output of about 600 MW

START Date: 
March, 1996
END Date: 
March, 1997
Recruited during the installation phase of the thermoelectric power plant CET3 (no. 3 gas turbines Nuovo Pignone of 115 MW and no. 3 steam turbines Ansaldo Industria of 85 MW) inside the Ilva steel works mill at Taranto. This is an innovative plant: a combined cycle fed by recovery fuel gases, produced by the steel work process, provided with a post-firing system.

Planning Engineer, Turbotecnica, Nuovo Pignone Group, Delimara Power Station Phase IIB

START Date: 
April, 1997
END Date: 
July, 1998

Combined cycle plant of 115 MW comprising two gas turbine generators Nuovo Pignone of 40 MW, a steam turbine General Electric of 35 MW, two heat recovery boilers, electrical high and low voltage systems, transformers and a distributed control system. Including fuel transfer and purification systems, feed water make-up and storage tanks, demineralising plant, sea water screen and pumping system. Responsible for the preparation and maintenance of the project schedule, review and comment on Contractors schedules and progress. Preparation of weekly and monthly progress reports.

Planning Engineer, RELIANCE ENGINEERING ASSOCIATES LTD, Jamnagar Export Refinery Project (JERP)

START Date: 
July, 2005
END Date: 
October, 2007
  •  Prepare and Update Various Registers pertaining to Engineering Deliverables, Procurement services, Manufacturing, Sub Contracting & Construction
  • Recording Progress of all discipline and Updating the schedule developed and monitoring it with the Project Baseline Schedule
  • Report generation on daily, weekly and monthly basis speaking on Achievements, Critical Issues, Schedule Analysis, Progress Analysis, Front Analysis and Resource Analysis
Experience Hours (Planning & Scheduling): 
4500

PLANNING ENGINEER, CNNC China Nuclear Power Engineering Co., Ltd., The Company's Infrastructure Project

START Date: 
September, 2016
END Date: 
April, 2019
Main responsibilities:(1) Being responsible for development and management of plan and cost in the  company's infrastructure projects;Achievements:(1) To ensure that the scope of schedule and cost are under control for the company infrastructure project;(2) Establishing standardized infrastructure project management system;
Experience Hours (Planning & Scheduling): 
5000
Experience Hours (Cost Management): 
2550
Experience Hours (Forensic Analysis): 
2050

Planning Engineer, China Petroleum Engineering & Construction Corporation (CPECC), 1.5 Million Tons/Year Continuous Reforming Unit Construction Project in the CNOOC Ningbo Daxie Petrochemical Company

START Date: 
January, 2015
END Date: 
January, 2016
Main responsibilities:(1) Being independent management of project plan,schedule and progress;(2) Being responsible for the planning of milestones, critical path, special control progress for project control system;(3) Being responsible for development and management of all level schedule ;(4) Being responsible for measurement of the project progress ;(5) Being responsible for monitoring progress by using physica
Experience Hours (Planning & Scheduling): 
2500