Primavera Planning & Scheduling

Assistant Project Manager, Paks micro International Ltd, Pwr Gas plant at Emene, Enugu- $0.5million USD

START Date: 
June, 1988
END Date: 
July, 1992

1988 – July 1992Project Manager  Paks Micro International Ltd. Enugu, Nigeria
Project Executed: Pwr Gas plant at Emene, Enugu- $0.5million USD

 X.  1987-1988 Site Engr  Winner Sports International Ltd, Enugu, Nigeria.

Project Executed 

Planning & Risk Engineer, Foure Lagadec, EPSC5 Anguille Redevelopment

START Date: 
May, 2011

I'm working as planning and risk engineer on EPSC5 Anguille Redevelopment project; my primary task is to give simulations to assist management in operational decision, help to avoid schedule creep 

- Planification of works (P6, Ms Project),

 - Reporting using s-curves and the method of Earned Value Management,- Risk management,

Scheduling Engineer, Bechtel LNG Contractors Limited, Brass LNG Project

START Date: 
May, 2011

My roles include but not limted to the following:

  • Schedule Development
  • Schedule Maintenance
  • Schedule Monitoring
  • Progress Reporting
  • Develop and apply installation rates to quantity takeoffs.

Planning Manager/Senior Planner, Transfield Services Australia, OIL AND GAS VARIOUS PROJECTS (HEADOFFICE POSITION)

START Date: 
December, 2000

I have been in planning roles for the past 11 years in the construction and mining fields using Primavera. Most of the roles have been on the project management team for the client. Most of these roles have been in Western Australia.

Head of project control office(Construction department–At site), Chicago Bridge and Iron (CB&I), Development Capital Projects

START Date: 
February, 2005
END Date: 
December, 2005

Creating a master Access database for recording the progress of all associated activities including piping, structural, mechanical, civil, tie-ins and demolition works.

  • Writing method statements and procedures.
  • Maintaining the P3/e schedule and creating all the progress reports.

Construction Site Planning, BECHTEL, Comalco Special Projects Misc.

START Date: 
January, 2006
END Date: 
July, 2007

Building and developing new and maintaining the existing construction schedules for the current 66 Special Projects for increase and maximisation of plant production.

  • Working in a management team maintaining the schedule requirements of 8 x Site Project Managers.
  • Daily client and contractor interface and schedule review during routine construction and shutdowns.
  • Contribution to weekly and monthly data collection and reporting including forecasts and trends.
  • Taking weekly progress photos, editing and issuance thereof a

Construction Site Planning, BECHTEL, Yarwun 2 Alumina Refinery Expansion Project

START Date: 
August, 2007
END Date: 
August, 2009

Building and development of the Bechtel Construction pre-bid Proposal and resourced Construction Execution Schedule with approximately 1,376,583 manhours within a team of planners.

  • After handing over the developed Bechtel Construction schedule to a dedicated contract scheduler for that seperable portion of work scope I resumed my role and duties as Site Project Planner within the EPCM management team for the overall Project Schedule as Principal Contractor.
  • Managing half the awarded Major Contractor Schedules and liaison within EPCM Team

Senior Planner, BECHTEL, Queensland Curtis LNG Project

START Date: 
October, 2010
END Date: 
September, 2011

Development of Cost Control and Contractor reporting systems until project gained NTP.

  • As I was deployed to the site very early ahead of the LNG Tanks’ commencement I assumed roles of both cost and trends engineer in the field reporting back to Bechtel corporate in Houston, Texas.
  • Job function included tailoring subcontractor reporting formats and monitoring early works subcontractors for marine facilities, site preparation (including clearing and bulk earthworks), camp facilities and Bechtel internal direct hire scope.
  • For the

Senior Planner, "KBR (Kellogg, Brown & Root) Design & Construction", Ichthys LNG Project

START Date: 
October, 2011

Current:

Development of [Perth Operating Centre] Project Schedule and associated Planning responsibilities.

Assistant Project Manager / Project Planner, BNFL (Sellafield Sites), Sellafield

START Date: 
January, 1987
END Date: 
October, 2000

Production planning team leader - Chemical plants planner - Batch Process planner - Construction planner.