Planning Engineer, Qatar Engineering & Construction company, Larsen & Toubro Limited, Maintenance works on LTFT Reactor & Mol seive adsorber vessel, Piping modification in QG, Kakrapara atomic power project, Kudankulam Nuclear Power Project

START Date: 
September, 2006
END Date: 
April, 2013

 

·   Study and understand the complete scope of work of the contract.

·   Derive / finalize the necessary materials (BOQ) and other necessary resources for executing the scope of Work from the Drawings.

·   Assist Procurement team and arrange for Procurement of Project materials.

·   Prepare “Work Packs” for LTFT reactor, Vessels & Piping modification works.

Planning Engineer, Qatar Engineering & Construction company, Larsen & Toubro Limited, Maintenance works on LTFT Reactor & Mol seive adsorber vessel, Piping modification in QG, Kakrapara atomic power project, Kudankulam Nuclear Power Project

START Date: 
September, 2006
END Date: 
April, 2013

 

·   Study and understand the complete scope of work of the contract.

·   Derive / finalize the necessary materials (BOQ) and other necessary resources for executing the scope of Work from the Drawings.

·   Assist Procurement team and arrange for Procurement of Project materials.

·   Prepare “Work Packs” for LTFT reactor, Vessels & Piping modification works.

Resident Engineer (Planning), National Buildings Construction Corporation Ltd., Railway Track Project

START Date: 
February, 1991
END Date: 
September, 1992

E  Construction & Planning of Railway Track Works worth Rs. 120 million for the Modernization of Durgapur Steel Plant, designed & Project Management  by MECON at Durgapur, West Bengal, India, from 1991 to 1992.

Resident Enginner, National Buildings Construction Corporation Ltd., Technical Complexes I & II for Defence Research & Development Organization an Industrial Project

START Date: 
April, 1985
END Date: 
April, 1987

Construction & Planning of Civil & Structural Works of Technical Complexes I & II for Defence Research & Development Organization an Industrial Project, designed & Project Management by Mecon at Hyderabad

Assistant Engineer Gr I (Civil), National Buildings Construction Corporation Ltd., BRAK Airport Project, Libya

START Date: 
December, 1980
END Date: 
January, 1982

Deputed to BRAK for the Construction of Airport Project, Libya for the Libyan Government, constructed by Airport Authority of India Ltd., designed by ITALCONSULT Italy, at BRAK, LIBYA, from 1980 to 1981costing 25 million USD, consisting of

§   Construction of main runway 2500mtr x 30mtr

§   Parallel taxiway 960mtr x 30mtr

Junior engineer Planning, Larsen & Toubro Limited, 330 MW PPN Power Project

START Date: 
August, 1999
END Date: 
January, 2002

 

·     Co-ordination with Client, Head office, Purchase Dept.

·     Preparation of Monthly Client invoice and S/C bill.

·     Preparation of various reports (JCR, Performance report, value driver etc.) in monthly basis.

·     Commissioned Centralized Control Room’s air conditioning.