Planning Engineer, Corrtech International Pvt. Ltd., 18”-36 Km(Mainline) and 8”-5.2 Km(Spurline) of five station (a)Dispatch terminal(Amboli) (b)Tap off – 02(Panoli) (c)Tap off – 03(Kosamdi) (d)SV-01(Hirapur) (e)Receiving terminal(Vantevad)

START Date: 
May, 2015
  1. Preparation of Work Progress Reports as per the daily, weekly and monthly progress basis, Co-ordination with site team and planning & QA/QC team for co-ordination etc.
  2. Preparation of S-Curve (Schedule Vs Actual).
  3. Preparation of Project’s Running Bills.
  4. Checking of Sub Contractor’s Bills & Preparing the debit notes etc.
  5. Preparation of presentation & MOM for project review meetings.
  6. Generating the Job Procedures of the Project as per the tender requirement.
  7. Handling all Kinds of Documentation Work.
  8. Handing over of all ki
Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
400

Graduate Engineer Trainee, Bridge & Roof Co. India Ltd, Construction of 400 KVA Switch Yard, Control room building & Transformer Yard at Neyveli – (US$ 2.5M

START Date: 
September, 2006
END Date: 
August, 2007
BRIDGE & ROOF CO.
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Senior Civil Engineer, Technofab Engineering Ltd., Buildings with all Utilities, Roads, Water,Drainage,Sewerage system

START Date: 
June, 2008
END Date: 
February, 2013

Construction project management,Planning & Scheduling,Construction site Execution Management, Supervision & Monitoring,Project Controls,Quantity Surveying,Billing,Contracts,Project Coordination, Site Deviation, Design Reviews, Reporting, Liaising,Documentation.

Senior Engineer (Planning & Project Controls), S.A. Baytur Construction Co., Construction of Multistoried Buildings with internal & external finishes and including all utilities

START Date: 
April, 2013

Construction Project Management, Planning & Scheduling, Project Controls, Construction Site Execution Management, Supervision & Monitoring, Quantity Surveying, Billing,Contracts Mgt., Vendor Management, Drawing Reviews, Reporting, Project Coordination, Drawing Review, Liaising, Meetings, Documents.

Civil Engineer, URS-Scott Wilson India Pvt. Ltd., Kaladan Multimadal Transit Transport Project (Jetty)

START Date: 
July, 2013
END Date: 
July, 2016

ü  Preparing DPR & forwarding the same to RO

ü  Receiving RFI for a day & closing the same when work ends

ü  Site visit for inspection work, quality checking, work progress etc

ü  Preparing the site visit report & fwd the same to respective engineer /manager

ü  Studying the drawing to estimate volume of work & expected obstacle for execution

Experience Hours (Planning & Scheduling): 
0
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Quantity Surveyor & Planning Manager, IL&FS Engineering and Construction Company Limited, BOT infrastructure Project

START Date: 
June, 2004

Over Nine years of experience in the construction field. I am capable of working on a wide range of projects, particularly in the section of Quantity Survey, Planning & Project management in mainly National Highways and State Highways.

Billing & Planning Engineer, kmc, NH Project

START Date: 
October, 1999

14 years experience as a planning & billing engineer in highway projects

Construction Project Planner, Al Rawaj Trading& Contracting LLC, Gammon India Ltd, Commercial, Residential, Metro Rail & Industrial Sectors

START Date: 
March, 2009

 

Competency Matrix 

Project Management, Planning and coordination:

Ü  Executing projects in a time bound manner with various project related activities such as Planning, Method Engineering, Construction Supervision, ResourcePlanning and Pre-Construction Activities.

Ü  Anchoring on-site construction activities to ensure Completion of project within the time & cost parameters and effective resource utilization to maximize the output.

Quantity Surveyor, KWAZY Engineering and Construction, Offices, Building and Warehouses

START Date: 
March, 2002
END Date: 
July, 2008

Prepare monthly billing statement for project assigned.

Review bills from SUbcontractor.

Serves as a Document Controller.

Quantity Surveyor, KWAZY Engineering and Construction, Offices, Building and Warehouses

START Date: 
March, 2002
END Date: 
July, 2008

Prepare monthly billing statement for project assigned.

Review bills from SUbcontractor.

Serves as a Document Controller.