Senior Engineer

Senior Engineer, AECOM, Network Rail, Crossrail West Stations

START Date: 
December, 2011

Design of improvement works to 13 stations west of Paddington that will become part of the Crossrail route. Assistant Planner resource loading the AECOM project schedule in Primavera P6.

Senior Engineer, Faber Maunsell AECOM, Manchester Metrolink Phase 3 - Tram Stop Design & Design Management

START Date: 
June, 2008
END Date: 
January, 2010

Design management/ co-ordination and design (preliminary, detailed and construction) of conversion of Oldham to Rochdale Line heavy rail stations to modular tram stops, responsible for:

Senior Engineer, Faber Maunsell AECOM, Cintra, Portugal High Speed Rail

START Date: 
July, 2008
END Date: 
October, 2008

Operational and maintenance cost model for Contractor bidding for 36 year concession (€92m).

Senior Engineer, Faber Maunsell AECOM, TfL London Rail, Step Free Access at 35 Stations Feasibility Study

START Date: 
July, 2007
END Date: 
September, 2007

Feasibility study for how step free access could be achieved at 35 stations spread over London, managed by six Train Operating Companies (TOCs). The work was commissioned to inform station prioritisation for funding from the Department for Transport (DfT).

Senior Engineer, Faber Maunsell AECOM, Thames Water, Banbury Station Under Track Sewer Crossing Strengthening

START Date: 
June, 2007
END Date: 
July, 2007

Design Team Member for Form A production and advice to Thames Water on the submission of approval documents to Network Rail for repairs to a brick sewer passing beneath Banbury Station. Options considered included a pre-fabricated replacement section and re-lining of the existing sewer.

Senior Engineer, AECOM, Network Rail, National Gauging Programme - Surveys, Analysis & Recommendations

START Date: 
January, 2011

Network Rail commissioned AECOM to undertake a range of surveys in support of a programme to restore freight traffic clearances at 134 sites across the South East, Western, LNE and LNW Territories.

Senior Engineer, GTP, Various

START Date: 
June, 1995
END Date: 
December, 2002

Formulating detailed cost estimate for piping and equipment disciplines.

Sharer in work estimate.

P3 Schedule preparation, based on engineering, materials delivery and procurement schedule Preparation documents: Schedule development, Schedule resource loading & Leveling andwork progress control :

- Gas storage tank (sphere : 2000 m3)

- Replace an existing pipeline (9,2 km of 10”,12”, 16” and 20”)

- Enhanced oil recovery in R / Baguel,

Senior Engineer, Planning, Downer, New Zealand, Major Projects North, Downer, New Zealand

START Date: 
July, 1974

Senior Engineer Planning - Downer EDI Auckland NZ (since 2007). Preparing tender programmes for all bid submissions and maintaining of construction programmes for all constructio projects under Major Projects North

Senior Engineer Project Controls (2003~2007)- Taiwan High Speed Rail.

Senior Engineer, Planning/Project Controls, Evonik Energy Services India, Power Plants - Head Office Various Projects

START Date: 
March, 2010
  • Plan projects from inception to completion; besides handling construction activities.

 

  • Develop schedule of activities, resource planning, project budgeting; monitor project progress and generate variation report for management.

 

  • Utilize Primavera in the preparation of schedule of activities

 

  • Development of Project Measurement Methodology and Tools for Engineering, Procurement and Construction

 

  •  Progress reporting in terms of performance indi

Senior Engineer, Christiani and Nielsen UK, A variety of tenders and site based projects

START Date: 
May, 1994
END Date: 
October, 1995

Senior Engineer at Christiani & Nielsen UK Ltd [ Edit ]
Civil Engineering industry
May 1994 – October 1995 (1 year 6 months)

Senior Engineer with Christiani & Nielsen in Leamington Spa design office, supervision, checking and co ordination of drawings from 5 CAD draftsmen for large wharf in Malaysia, moving onto temporary works and initial planning (including the project plan) for a submerged double pipe pull in Singapore. Joined AMEC in October 1995. (See above). Some planning work in Time-Line package.