Senior Engineer, Faber Maunsell AECOM, Manchester Metrolink Phase 3 - Tram Stop Design & Design Management
Design management/ co-ordination and design (preliminary, detailed and construction) of conversion of Oldham to Rochdale Line heavy rail stations to modular tram stops, responsible for:
• Stop Design Team Site Inspection MS & RA, Design of accesses (ramp, stairs & lifts), platform foundations and modules, shelter locations, drainage, system integration including (CCTV, PA, Lighting, PID, TVM, SER, DNO supply).
• Stop Standard Details co ordination with specific responsibility for handrails & guardrails, fencing, signage and track crossing.
The above was undertaken for 4No. off-street stops (3 No. in cutting, 1No. embankment lowering) and 1 No. stop on-street within a conservation area.
Other Activities:
• Media City Spur Specification (co-ordination & collation),
• 2 No. Station Decommissioning Designs,
• 2 No. Stop passive provision assessments.