maintenance engineer, Hindalco Industries Ltd, Plant maintenance

START Date: 
February, 2006
END Date: 
August, 2007

Worked as mechanical maintenance engineer in  fertiliser sector. Responsible for maintenance activities in the plant

Experience Hours (Planning & Scheduling): 
2000

Maintenance Engineer, Transfield Worley Ltd, Woodside Energy Maintenance Management Project

START Date: 
January, 2002
END Date: 
November, 2002

Woodside Energy Maintenance Management Project

- Maintenance Engineer

           

Employed in the role of asset specialist in the rollout of SAP-PM to replace MCP, the Woodside legacy maintenance planning system.  Responsibilities included:

 

·       Rationalise and align facility technical data profiles and defining unified master class characteristic sets

Experience Hours (Planning & Scheduling): 
100

Maintenance Engineer, Afnan Water Factory, Maintenance Process Implementation, LOTO, PTW, Toolbox, Preventive Maintenance

START Date: 
December, 2011
END Date: 
September, 2012

Mechanical Engineer/Planner -AFNAN WATER FACTORY

Hanaia Road, Alkharj City, KSA (Dec. 16,2011 – Sept. 15, 2012

Maintenance Engineer, AL Nasserieh Power Plant, AL Nasserieh Power Plant

START Date: 
March, 1997
END Date: 
January, 2002

I hadthe responsibility of undertaking mechanical maintenance:dealing with Fiat Gas TurbineType TG50D5; the turbine and its accessories: oil lubricating system, GasTreatment Plan,various kinds of pumps and different types of air compressors.

Maintenance Engineer, Shyam Erectors, Indian Oil Refinery, Mathura Refinery.(U.P)

START Date: 
June, 1995
END Date: 
June, 1996

Worked as a Maintenance Engineer at Indian Oil Corporation Ltd., Mathura Refinery, for the on going Annual Maintenance Contract during the period Jun 1995 to June 1996 

Maintenance Engineer, AGORTECH Pvt. Ltd, Construction

START Date: 
January, 2005
END Date: 
April, 2006

Responsible for INSTALLING and MAINTENANCE of the Compressors & Pumps

Provide Preventive Maintenance & Scheduling for preventive and Breakdown Maintenance

Centrifugal Pumps Replacement of mechanical seals, rotor, wearing rings, bearings, shaft alignments and complete overhaul

Reciprocating Pumps Replacement of plungers, plunger packing, valves, inspection and maintenance of crank case and cross head

Maintenance Engineer, Custom Pharmaceuticals Ltd, Operations

START Date: 
November, 2004
END Date: 
August, 2007

Set up, maintenance, configuration, start up and finding/solving day-to-day problems of high speed blisters packaging lines, as well as pots and strip-packing lines. Also involved in the maintenance of the equipment, scheduling and working on changing parts stock, repairing, lubrication. Working with statistical failure analysis and breakdown reduction to avoid stops out of schedule. Working as well with changeover time reduction, producing a changeover sheet/procedure to reduce time. Developing SOP’s for equipment maintenance and operation.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content