START Date:
September, 2007
Engineering, Procurement and Construction Management of LRCCU plant modification and extension project, including:
-Piping Modification
-Heat exchanger, column, vessel, Tankage, reactor and regenerator , air fin cooler, separating equipment ,pump, compressor and blower equipment modification and new installation
-CO Boiler revamp and restoration included tube banks, Superheater, Ecomoniser, Soot blowers, Deslaggers, FD Blower, CO ducts) feed water drum, de-superheater, economizers)
1) Set up Work Break Down Structure for progress measurement and scheduling.