Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Senior Planner

Senior Planner, Tradesmen Enterprises, Various

START Date: 
October, 2016

Planning and project controls in regard to Piping/Structural Steel/Module Fabrication and Assembly, Facility Construction, Pipeline Construction, and Maintenance/Turn Arounds.

Senior Planner, Goulburn-Murray Water, Irrigation System in the Goulburn Murray District

START Date: 
January, 2012

The connections project is a $2billion project to modernise the irrigation system in the Goulburn Murray Irrigation District in Northern Victoria.

Perry has created and is maintaining a number of schedules on this project, the largest of which is ~12,000 tasks

Senior Planner, SCI, Infrastructure projects

START Date: 
July, 2013
END Date: 
July, 2017

From 2013-2014: Site Engineer in Road field.

From 2014-2015: Quantity Surveyor in Infrastructure field

From 2015- Present: Leader of Bidding Team in Infrastructure filed

Senior Planner, SCI, Infrastructure projects

START Date: 
July, 2013
END Date: 
July, 2017

From 2013-2014: Site Engineer in Road field.

From 2014-2015: Quantity Surveyor in Infrastructure field

From 2015- Present: Leader of Bidding Team in Infrastructure filed

Senior planner, Parsons Brinkerhoff , HIGH SPEED 2 (HS2)

START Date: 
May, 2012
END Date: 
December, 2012

Responsible for developing and maintaining the plan in Primavera P6 in producing and managing a robust design process. Including the definition of requirements, scope, assumptions, development phasing, work and asset breakdown and verification and validation regime that result in a safe and affordable design for the High Speed 2 (HS2) and  London-West Midlands (LWM) project.  As well as managing internal design interfaces between discipline leads & PSC’s Project Coordinators.

Experience Hours (Planning & Scheduling): 
1350
Experience Hours (Cost Management): 
1350

Senior Planner, Athena Project Services (C Spencers Ltd), London Overground and West London Lines Projects

START Date: 
July, 2013
END Date: 
March, 2014

Charles developed the integrated cost and schedule for the capital improvement programme to support the introduction of 5-car trains on London Overground include; improvements to facilities at New Cross Gate Depot, Extension of Platforms on the ELL and delivery of Silwood Sidings.. Established processes to ensure the integrity and the maintenance of the project information and reports.

Experience Hours (Planning & Scheduling): 
1300
Experience Hours (Cost Management): 
1300

Senior Planner , AMEC Foster Wheeler, Neutral Beam (International Thermo Nuclear Reactor (ITER))

START Date: 
July, 2016
END Date: 
September, 2016

Employed to develop & monitor the resource loaded schedule for the 7 phases of the project, total value £75M. I undertook the role in parallel with the AXIOM role. Prior to this I led the bid (cost & schedule) for the ITER Detritiation project (€6.5M).

Experience Hours (Planning & Scheduling): 
300
Experience Hours (Cost Management): 
100
Experience Hours (Forensic Analysis): 
50

Senior Planner, BAHWAN ENGINEERING COMPANY, Various

START Date: 
March, 2010
END Date: 
November, 2011

Preparation of resource and cost loade

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
1200

Senior Planner, UGL Resources, RGP5; RGP6, LYNAS RARE EARTHS PROJECT – Design

START Date: 
April, 2010
END Date: 
September, 2012

·         Worked with a team of planners on RGP5 Project and was also the designated shutdown planner for managing pre-shut works and shutdown works on 12 shuts. These shutdowns were implemented successfully according to the client.

·         Was involved on Lynas Rare Earths Construction Project for some months.

·         Also supported the bid team for tendering with developing schedules and assisting with manpower estimating.

Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
400

Senior Planner, Parsons Brinckerhoff Australia, Cataby

START Date: 
January, 2014
END Date: 
December, 2014

·         Partnered successfully with PB and Iluka teams to produce definition feasibility schedule.

·         Monitored and assessed project activity data for accuracy and efficiency. Maintained and updated proper cash flow data. Develop procurement schedules for long lead items.

Experience Hours (Planning & Scheduling): 
600
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
0

Market Place

No results found... (try selecting a different content filter)

Syndicate content