Planning Engineer, Turbotecnica, Nuovo Pignone Group, Cogeneration Power Plant CET3 - Electrical power output of about 600 MW

START Date: 
March, 1996
END Date: 
March, 1997
Recruited during the installation phase of the thermoelectric power plant CET3 (no. 3 gas turbines Nuovo Pignone of 115 MW and no. 3 steam turbines Ansaldo Industria of 85 MW) inside the Ilva steel works mill at Taranto. This is an innovative plant: a combined cycle fed by recovery fuel gases, produced by the steel work process, provided with a post-firing system.

Planning Engineer, Turbotecnica, Nuovo Pignone Group, Delimara Power Station Phase IIB

START Date: 
April, 1997
END Date: 
July, 1998

Combined cycle plant of 115 MW comprising two gas turbine generators Nuovo Pignone of 40 MW, a steam turbine General Electric of 35 MW, two heat recovery boilers, electrical high and low voltage systems, transformers and a distributed control system. Including fuel transfer and purification systems, feed water make-up and storage tanks, demineralising plant, sea water screen and pumping system. Responsible for the preparation and maintenance of the project schedule, review and comment on Contractors schedules and progress. Preparation of weekly and monthly progress reports.