how to shift the project from a perticular EPS

2 replies [Last post]
kumar s
User offline. Last seen 8 years 48 weeks ago. Offline
Joined: 26 Jan 2010
Posts: 159

Dear All

how can we shift the project from EPS to another without exporting  and importing option.

i mean can we do it directly by going to projects view

 

 

 

Replies

Andy Power
User offline. Last seen 4 years 9 weeks ago. Offline
Joined: 30 Aug 2006
Posts: 43
Groups: None

If you are talking about moving a project between EPS nodes the as long as you have access rights to both nodes and sufficient user privileges just drag and drop the project (you need to click on the project on the very far left of the window in the coloured banding to pick it up).

 

NOTE:  Make sure you don't have any filter applied first!

Dewald Badenhorst
User offline. Last seen 11 years 46 weeks ago. Offline
Joined: 30 Apr 2008
Posts: 9
Groups: None

Try cut and paste