Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Tips on using this forum..

(1) Explain your problem, don't simply post "This isn't working". What were you doing when you faced the problem? What have you tried to resolve - did you look for a solution using "Search" ? Has it happened just once or several times?

(2) It's also good to get feedback when a solution is found, return to the original post to explain how it was resolved so that more people can also use the results.

How to switch between open projects ?

13 replies [Last post]
David Moses
User offline. Last seen 11 years 46 weeks ago. Offline
Joined: 20 Oct 2004
Posts: 122
Hi There,

On Primavere Version 3.1 it is easy to switch between open projects, by selecting the name of open projects which are listed under "Windows Menu".

(Same thing is available on excel, word etc.)

It is easy to use I believe.

What is the easy way to switch between open projects on Version 5.0? Is there any similar solution for this as version 3.1?

Regards,

Replies

Bijaya Bajracharya
User offline. Last seen 8 years 23 weeks ago. Offline
Joined: 25 Feb 2005
Posts: 175
Groups: None
Jorge,

It is intesting to see how you think you can go around working with multiple projects and layouts and then conclude that layout is the problem. And I am afraid it is not anoother topic - it the same topic. If you have two projects open you must be able to see them in two different layouts. Primavera has completely ignored this in P5 and failed to incorporate it in P6. Very disappointing.

Programme based is fine and is a good concept. But you cannot force everybody to think and manage all the projects of a company to be managed centrally.
Jorge Taguinod
User offline. Last seen 2 years 41 weeks ago. Offline
Joined: 8 Jul 2003
Posts: 139
I think the perspective of Primavera from moving from a "project-based" system to a "program-based" or "enterprise-based" one should be considered.

During P3 days, people used to deal with "disconnected projects". However, even in P3, you’d have project groups and projects. If you adjust your perspective to this "project group/projects", you’d see that the enterprise version is the same -- albeit more powerful.

As for layouts, I think that it is assumed that you have to tidy up how you define your layouts. Defining layouts "on-the-fly" will create numerous layouts and will make life hard for the user with all the clutter. Try sitting back and define your standard layouts. This way, no matter which project you’re working on, it would be easy to pull-out a layout.

As for switching back and forth on projects, (as you know) you can open multiple projects at the same time. What I do is that I define multiple filters so that I can focus on one project at a time while working on a program (group of projects). This way, my screen is unclutterd with multiple projects.

I still think the P5 is much easier to use -- like you can have long activity descriptions, resource codes/descripions, etc.

My only single problem is the need to always adjust print layouts (which is a time waster). But this is another topic.

Hope this helps.
Mangesh Khuspe
User offline. Last seen 50 weeks 1 day ago. Offline
Joined: 10 Apr 2007
Posts: 162
Hi
dear i completely agree with what bijaya has said,
anyway just can’t help it out.

regards

mangesh
David Moses
User offline. Last seen 11 years 46 weeks ago. Offline
Joined: 20 Oct 2004
Posts: 122
Oh Dear,

Completely agree with you !!!

I am in the same situation everyday.

Regards

Ps.

* Is is possible to have someone from Primavera to fix this?
Bijaya Bajracharya
User offline. Last seen 8 years 23 weeks ago. Offline
Joined: 25 Feb 2005
Posts: 175
Groups: None
This feature is more than just user friendliness for me. Many of us work in multiple projects. Eg - you may be updating progress in one project in a particular layout, then you get a call from someone to print off a list of his department activities for another project. In P3 you can do it very easily. But in P5 - the moment you open the second project the first project is closed. Even worse is that the second project gets open in the layout you were working in the first project. Then you search for the particular layout for the second project, do the necessary things. And then you open the first project again. You will find that now it opens in the layout of the second project. Then you need to look for the layout you were working earlier. It is such a waste of time.

Things get worse when you have project activity codes in some columns. You might have spent a good amount of time creating that layout for a project. But the moment another project gets open with that layout, it is spoiled - because it won’t find that field and as a result the column will be lost. If you have organized your data according to that data it is even worse.

David Moses
User offline. Last seen 11 years 46 weeks ago. Offline
Joined: 20 Oct 2004
Posts: 122
Hi There,

Dear Bijaya, it is not a good news.

But it was really quick and easy, dont you think so?

I understand the logic of development for version 5.0. Adding new features and all others OK.

But there is no need to reinvent the already known facts and easy ways to use such software. (It is not related with the logic/algorithms of software). It is related with the ergonomics or usability or user friendliness of software I think.

Regards,
Bijaya Bajracharya
User offline. Last seen 8 years 23 weeks ago. Offline
Joined: 25 Feb 2005
Posts: 175
Groups: None
You may be disappointed to know that this feauture is still not there in forth coming P6.
David Moses
User offline. Last seen 11 years 46 weeks ago. Offline
Joined: 20 Oct 2004
Posts: 122
Hi There,

Yes Valentin, You are right.It works, but it is not "switching" I think. By doing this you can not see all open projects concurrently as before on version 3.1.

Regards,
Valentin Sendula
User offline. Last seen 9 years 44 weeks ago. Offline
Joined: 4 Jun 2007
Posts: 12
Hi David,

I also can’t find this option, but I get the impression that, unless you open the 2 projects in the same layout, P3E closes the previous project before opening another one.
Therefor you can use under file, the recently opened projects list (just like in MS Office products) to switch between projects.

Regards,

Valentin
Frank Borcherdt
User offline. Last seen 7 years 41 weeks ago. Offline
Joined: 3 May 2001
Posts: 88
Groups: None
I find that right mouse click collapse all, select the project I want project and right click expand all is easier than scrolling through a the activities. Depends of current view and layout settings but works for me.

HTH

Frank Borcherdt
David Moses
User offline. Last seen 11 years 46 weeks ago. Offline
Joined: 20 Oct 2004
Posts: 122
Hi There,

I see, but my mouse is trying to click one of the open projects listed under windows menu. But it founds nothing since there is no such thing on version 5.0.

It is an old habit or custom.

Anyway life goes on :)

Thank you all

Regards,
Patricia Le Clainche
User offline. Last seen 9 years 47 weeks ago. Offline
Joined: 18 May 2007
Posts: 86
Groups: None

I have no solution either in V5.

Another way of working that I know was used in V4, was that some users used two differents users name and it was easy to change of user ("File _ Login as different user" if I remember) ; it was easy to switch for one to another one. This is also no more possible.

Bijaya Bajracharya
User offline. Last seen 8 years 23 weeks ago. Offline
Joined: 25 Feb 2005
Posts: 175
Groups: None
Unfortunately there seems none. That’s what I have found from a similar question I posted several months ago in this column. You can open two or several projects at a time by pressing Ctrl key. But all these projects will open in same layout. Only option left then is to scroll up and down. This is not at all practical if you are working in two different types of projects.