wbs problem -urgent

10 replies [Last post]
John peter
User offline. Last seen 19 years 47 weeks ago. Offline
Joined: 13 Sep 2004
Posts: 10
Groups: None
I have made wbs for a project as under:
1. Construction of Building
2. Phase 1
3. phase 2
4. Externat Works

My problem is that when I organize Level I with TOTAL the Final date is only shown of WBS 1,2 and 3 without Externatl Works Final date?

Why this happens? Why External Final date is not shown in Level total?

Please suggest me a way so that Level cover whole 1,2,3 and 4 wbs dates:

Its urgent plz

Replies

Frank Borcherdt
User offline. Last seen 7 years 36 weeks ago. Offline
Joined: 3 May 2001
Posts: 88
Groups: None
Can also update activities using Global Change i.e. SS(WBS,x,y) where x is start position including the separators and y is length.

To update the dictionary see knowledge base article 200252492644 and use Project.xls to export the WBS codes and tiles, then massage this to conform to a previously saved activity code format and then import the activity codes and titles.

Work in a copy or make sure you have good backups before you start.

Steven Oliver
User offline. Last seen 11 years 39 weeks ago. Offline
Joined: 8 Nov 2002
Posts: 313
Groups: None
There are some spreadsheets (activity.xls) provided with the P3 installation CD, which with a bit of tweaking would let you do this.


HTH


Dayanidhi Dhandapany
User offline. Last seen 3 years 21 weeks ago. Offline
Joined: 18 Mar 2003
Posts: 470
Groups: None
Dear John,

Send a copy of your program to plannerdaya@yahoo.com, let me have a look.

Regards

Daya
Shahzad Munawar
User offline. Last seen 9 years 16 weeks ago. Offline
Joined: 2 Jul 2003
Posts: 551
Groups: None
Hi John

In my view your WBS coding and defining is not correct which needs to be reviewd that’why when you organize, it does not cover the FINAL date of whole project.

Moreover send me your copy of P3 file for correcting this error.

Rafael Davila
User offline. Last seen 21 hours 11 min ago. Offline
Joined: 1 Mar 2004
Posts: 5233
Try organizing first by Project with totals then by WBS. In this way (organizing by activity codes) you make sure you are adding a level above all WBS codes, totals will roll up to the project level. If this works then check on your WBS structure.
Jaco Stadler
User offline. Last seen 17 years 44 weeks ago. Offline
Joined: 9 Sep 2004
Posts: 299
Groups: None
Have a look at your wbs Structure I think the problem is there.

Standard P3 setting will not allow this to work correct. (10)

Data - WBS - Structure

Also remember to look at organize and total at the different levels
MK TSE
User offline. Last seen 4 years 11 weeks ago. Offline
Joined: 27 Feb 2002
Posts: 550
Groups: None
(Sorry for the duplicated postings since a book falls on the keyboard when I editing.)

Consider the WBS as follows: -
1. Construction of Building
1.1 Phase 1
1.2 Phase 2
1.3 External Works
MK TSE
User offline. Last seen 4 years 11 weeks ago. Offline
Joined: 27 Feb 2002
Posts: 550
Groups: None
According to your listed, all 4 items are in Level 1.
would you mind list the WBS value against the item for further details
MK TSE
User offline. Last seen 4 years 11 weeks ago. Offline
Joined: 27 Feb 2002
Posts: 550
Groups: None
According to your listed, all 4 items are in Level 1.
would you mind list the WBS value against the item for futther details
MK TSE
User offline. Last seen 4 years 11 weeks ago. Offline
Joined: 27 Feb 2002
Posts: 550
Groups: None
According to your listed, all 4 items are in Level 1.
would you mind list the WBS value aginst the item for futther details