Jeff, my reading and understanding of teh situation is the same as Dieters
Layouts, filters and that cannot be brought across. Mind you, given how arcane the filter system is in P3, Im not surprised.
You may be able to do something clever with ODBC to extract the filter data from P3 then copy/paste into the P3e forms but frankly, Id just write new ones
We are planning a migration from P3->P3e atm and are expecting to write all of our layouts etc from scratch.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Thanks Guys - I believe it always good approach start from the scratch.
Regards,
Jeff
Jeff, my reading and understanding of teh situation is the same as Dieters
Layouts, filters and that cannot be brought across. Mind you, given how arcane the filter system is in P3, Im not surprised.
You may be able to do something clever with ODBC to extract the filter data from P3 then copy/paste into the P3e forms but frankly, Id just write new ones
We are planning a migration from P3->P3e atm and are expecting to write all of our layouts etc from scratch.
Hi Jeff
The following was taken out of "From P3 to Primavera_V5" on the documentation CD. It is the same for P6.
"Data not converted This section lists the data items that are not converted from P3 to the Project Management module.
■ Layouts, filters, and Global Change, report, and graphic
specifications Layouts, filters, and Global Change and
report/graphic specifications are not converted with the
project; however, sample data is provided for these items in
the Project Management module."
But as it is very easy to create new layouts in P6, for me this never was a problem.
Regards
Dieter