Planing Engineer, DDT Konstract Inc., Building Construction

START Date: 
May, 2003

 

Planning Engineer May 2012- Present-DDT Konstract Inc. (DDTKI)-Unit 401 4th Floor,Lancaster Hotel, #622Shaw Boulevard,

Mandaluyong City, Philippines, -BDO CORPORATE CENTER PROJECT-(ARPIL 10, 2012-FEB 24, 2015) –ON-GOING

Planing Engineer, DDT Konstract Inc., Building Construction

START Date: 
May, 2003

 

Planning Engineer May 2012- Present-DDT Konstract Inc. (DDTKI)-Unit 401 4th Floor,Lancaster Hotel, #622Shaw Boulevard,

Mandaluyong City, Philippines, -BDO CORPORATE CENTER PROJECT-(ARPIL 10, 2012-FEB 24, 2015) –ON-GOING

Planing Engineer, DDT Konstract Inc., Building Construction

START Date: 
May, 2003

 

Planning Engineer May 2012- Present-DDT Konstract Inc. (DDTKI)-Unit 401 4th Floor,Lancaster Hotel, #622Shaw Boulevard,

Mandaluyong City, Philippines, -BDO CORPORATE CENTER PROJECT-(ARPIL 10, 2012-FEB 24, 2015) –ON-GOING

Planing Engineer, DDT Konstract Inc., Building Construction

START Date: 
May, 2003

 

Planning Engineer May 2012- Present-DDT Konstract Inc. (DDTKI)-Unit 401 4th Floor,Lancaster Hotel, #622Shaw Boulevard,

Mandaluyong City, Philippines, -BDO CORPORATE CENTER PROJECT-(ARPIL 10, 2012-FEB 24, 2015) –ON-GOING

Site Engineer, P.C. Thomas & Co., Kochi, Kavarathi Stadium

START Date: 
June, 2001
END Date: 
April, 2002

• Execution of multi-storied building projects as per standards & technical specifications.

• Liaise with Consultant, Client, Subcontractors and Suppliers.

Planning Engineer / Project Coordinator, Murr Group, “Cap Sur Ville” Residential and Recreational Project, Lebanon. The project comprised 3 high-rise buildings (34 floors above ground and 2 basements each) with a height of 120 m, 18 buildings of 7 floors

START Date: 
January, 1994
END Date: 
August, 1995

Duties include ensuring that work is progressed as scheduled by identifying trends for management attention and by taking early prevention measures; reviewing the strategy of work submitted by the construction team of the various sections and adjusting the schedule to suit work constraints and open fronted areas; monitoring and reviewing the periodically project updated schedule; site coordinating between various trades and coordinating schedule variances; identifying delay and slippage, and providing recommendations for performance improvement and/or corrective

Planning Services Manager, Black & Veatch, Departmental staff

START Date: 
February, 2008
END Date: 
October, 2009

Planning Services Manager.  Reported directly to Project Controls Director.

Responsible for: developing and updating standards and guides governing divisional Planning functions; developing and delivering training for planners and schedulers; recruiting planners and schedulers; interfacing with engineering, procurement, estimating and construction departments' managment and divisional management; developing standard schedule logic for reference plants; evaluating software for planning use; providing input for software development; assigning planners and schedulers to proje

General Superintendent, A.E. Cutright Jr., Building Contractor, Multiple Projects

START Date: 
May, 1968
END Date: 
May, 1973

A. E.

Scheduler / Planner, K.span Qatar, 50 Residential Villas

START Date: 
February, 2008
END Date: 
January, 2009

•     Prepares project estimate and bill of quantities.
•     Prepares resource loading, s-curve planned / forecast cost.
•     Supervise collection & processing of timesheets.
•     Review vendor and sub-contractor drawings.
•     Review contractor schedules, manpower loading/offloading and delivery schedules of bulk materials.
•     Review Construction Scope of Work
 