Structural Engineer, Misr Concrete Development, General Building

START Date: 
July, 2004
END Date: 
December, 2006

Structural Engineer

1.      Design and check of design assuring the compliance and acceptance of design with various types of Codes (Egyptian or ACI or BSI codes) for various types of constructions.

2.      Prepare workshop drawings – using AutoCAD - according to standards and specifications.

3.      Structural analysis and check using SAP program.

Experience Hours (Planning & Scheduling): 
400

Cadet Engineer, Chiyoda Philippines Corp, Oil & Gas Projects

START Date: 
January, 2005
END Date: 
October, 2005

I started as a Cadet Engineer for a structural design company which I was involved in the design of support frameworks for mechanical equipments, routing of pipelines, drafting and revising plant and instrument diagrams.

Structural Design Engineer, Bingham Cotterell Consulting Engineers, Various Building Projects

START Date: 
August, 1994
END Date: 
August, 1995

Design experience with Bingham Cotterell -

Re-furbishment of Midland Banks in the north & midlands requiring extensive structural input, many buildings being 150+ years old; feasibility studies.

Structural alterations to old mills & factories in the Manchester area involving extensive & complex work to brick barrelled floors.

Main design packag

STRUCTURAL & SITE ENGINEER, SR. PLANNER, Meinhardt, Hopewell Holdings, CEPA, AOKI Corporation, etc, 3X660 MW Coalfired Power Station, Commercial Buildings, Airport Superhighways and Railways

START Date: 
April, 1989
END Date: 
August, 1997

HONGKONG PROJECTS INVOLVEMENT:

  • Project Planner and Controller of the West Kowloon Expressway project (WKES) (i.e. expressway, roads, bridges and MTRC floating railway tunnels) of the Airport Core Development Projects. Also involved in the project control and monitoring of the Northern Kowloon Site Roadworks and the Yam-O Section Site Development.
  • Project Management - Project planner of the assigned projects in Haeco Airport (HK) and China.

CHINA PROJECT INVOLVEMENT:

Manager of Design and Marketing, Redco International, 10 Kindergartens, 7 Schools, QIPCO Tower, Emadi Tower

START Date: 
July, 2006
END Date: 
October, 2008

-              Manager of Design & Marketing

-              Projects Coordinator.

-              Coordination between pricing, designing, production and erection.