Site Planning Engineer, Atkins Faithful & Gould, New King Abdulaziz International Airport Development Project

START Date: 
August, 2011
END Date: 
May, 2015

·        Preparation of a comprehensive cost and resource loaded contract baseline time schedule for the Aprons, Taxiways, Load Centers, Airside Storm water network (Pipe and box culverts), Blue Water Network, Airfield Ground Lighting network and the associated Vault Rooms, Glycol Network, 400Hz Network, Fuel Hydrant Network from the Fuel Farm, Fuel supply network from Aramco depot, GSE Tunnel/Ramps and security checkpoints, by reading the design drawings (70%).

Planning Director Assessor, Petrobras Internacional - Braspetro, All Portfolio of Projects

START Date: 
January, 1990
END Date: 
February, 1992

Acted as Director's key aide by detecting and solving management problems. Boosted operational efficiency and controlled risk.
Projects: Diverse E&P corporate oil & gas projects including offshore/onshore field surveys, floating platforms, rigs, production systems, pipelines, flexible drilling pipe plant, storage tanks, etc.
• Actively participated in the implementation of the Strategic Planning process to eliminate the dependency on capital injections by the holding company utilizing complex financial-econometric models and strategic analyses.