New King Abdulaziz International Airport Development Project

Site Planning Engineer, Atkins Faithful & Gould, New King Abdulaziz International Airport Development Project

START Date: 
August, 2011
END Date: 
May, 2015

·        Preparation of a comprehensive cost and resource loaded contract baseline time schedule for the Aprons, Taxiways, Load Centers, Airside Storm water network (Pipe and box culverts), Blue Water Network, Airfield Ground Lighting network and the associated Vault Rooms, Glycol Network, 400Hz Network, Fuel Hydrant Network from the Fuel Farm, Fuel supply network from Aramco depot, GSE Tunnel/Ramps and security checkpoints, by reading the design drawings (70%).

Senior Planning Engineer, Faithful+Gould (Atkins Group), New King Abdulaziz International Airport Development Project

START Date: 
November, 2011
END Date: 
August, 2012

·          Developed a master database for the projects by collecting all the relevant information required about each project, including but not limited to, resources, schedule and current status and maintains the database by updating the data regularly.

·          Prepared project schedules in consultation/agreement with all sections involved.