All aspects of Project Planning

National Manager Construction Planning , NBN Co, National Broadband Network

START Date: 
July, 2013
END Date: 
September, 2014

Effective leadership and development of a high performing team. I achieved this by leading, coaching and encouraging team members in order to develop them individually to achieve their career goals. I promote an environment where change is embraced and innovation can thrive.

 

Achievements

•       Lead a team of 12 planners to oversee a portfolio of over 14000 project schedules across 27 technologies.

Experience Hours (Planning & Scheduling): 
2250

PLANNING ENGINEER, Nael and Bin Harmal Hydroexport-W.L.L., Roads and Infrastructure Projects

START Date: 
September, 2004
END Date: 
July, 2007

Planning Engineer : Responsible for Developing, Monitoring and Maintaining programs and schedules for multiple projects. Responsible for preparing weekly progress report, cash flow report & Contract administration with the objective of protecting Client’s interest.

Outage Planner, EDF Energy, Stat Outages

START Date: 
October, 2013

WORK EXPERIENCE      

Jun 2007 - Present          EDF Energy, Dungeness B Nuclear Power Stn

Outage Planner for statutory outages at Dungeness B Nuclear Power Station using P6.

Outage Planner, EDF Energy, Stat Outages

START Date: 
October, 2013

Planning for statutory outages, Project planning and general prject management.

Outage Planner, EDF Energy, Stat Outages

START Date: 
October, 2013

Planning for statutory outages, Project planning and general prject management.

Planning&cost monitoring, IBN KHALDUN, Dukum Airport-OMAN

START Date: 
December, 1987
END Date: 
September, 2013

A professional  SR.PLANNING ENGINEER  over 25 yearsof diverse experience (11 years

 abroad and 14 years in India) ranging from pre to post-contract Planning, Quantity

Surveying. Worked in multi-disciplinary firms (both consultancy and construction) in

overseas and India.  Adaptable to varying situations, possess sound   and in-depth

Core Team Senior Planning Engineer, Galliford Try (Infrastructure Division), BFA, Airdrie to Bathgate

START Date: 
June, 2007
END Date: 
October, 2008

Working within the BFA I was responsible to the Contracts Manager for planning all the works in Scotland being carried out under that contract.  Projects were planned through their full life cycle from GRIP Stage 3 to 8, including logic linked technical, commercial, procurement and physical work activities phased through option selection, option development/outline design, detailed design, construction testing and commissioning, scheme hand back and project closeout.   The projects included complete station refurbishments, major re-roofing, train she

Construction Project Planner / Senior Planner, BBCEL, Heathrow Terminal 2B

START Date: 
May, 2012

2012 to date

Senior Planner – Heathrow Terminal 2 (T2B Phase 2) – External, Civils and Envelope works

Lead Planner for Civil, External and Envelope works of the 400m long pier which serves 10 aircraft stands. Manage the planning, scheduling, progress monitoring, supplier liaison, and the interface of both internal / external teams and the client Heathrow Airports Ltd.

2002 to 2012

Lead Planner / Project Manager – (Secondment to London Underground Ltd)

Project Planner, Keppel, Barge, FPSO & Topsides (Oil and Gas)

START Date: 
April, 2008
END Date: 
August, 2010

Successfully deliver a Barge before dead line with cooperation of Project team. Awarded with another Barge conversion project to end date. Involved in a few FPSO project and repair works of retrofitting with short durations.

Project Planner, MPO, Riser Safety System, Measured Pressure Drilling System

START Date: 
February, 2013

Produce Master Programme and Project Control of all projects in Organization. Monitor Sub-Contractors programmes and evaluate vendors etc..