Sincor Upgrader Project

Commissioning Planning Engineer, Total, Sincor Upgrader Project

START Date: 
August, 2000
END Date: 
September, 2001

Working as part of the Project Management Team developing the Commissioning Programme for the Upgrader Complex which comprised a Desalting and Crude Distillation Unit, Delayed Coking Unit, Sulfur Recovery Unit, Gas Sweetening Plant, Mild Hydrocracker and Hydrogen Manufacturing Unit (project total ~$4.2 billion).

Produced Integrated and summarised programmes to system level from the more detailed programmes of Main Contractors as well as the Operating Group. Preparation of reports and presentations to Commissioning Manager and Partnership Directors.

Planning & Controls Engineer, ALSTOM T&D VENEZUELA, Sincor Upgrader Project

START Date: 
December, 1999
END Date: 
May, 2002

Planning and Project Control Engineer for Instrumentation Construction Works Project, on an oil & gas plant for Sincor, subcontracted for Contrina(s) group (Technip – DIT Harris – Kellog Brown & Root - Inelectra). This instrumentation project, executed under PDVSA – TOTAL - SINCOR standards, included 14,000 instruments calibrated, 8,000 instruments installed and loop tested, 550 PSV tested, 14 km of cable tray installed, 6 km of fiber optic cable pulled, 82 multi-cables junction boxes installed, and more than 300 km of instruments cable pulled.