Assistant Manager - Planning, Gujarat, India, Neo Structo Construction Pvt Ltd, Surat, India, Kerala, Kochi, Kochi Refinery, Mechanical /Piping works For DHDS Area of Motor Spirit Block Project at Bharat Petroleum Corporation Ltd

START Date: 
October, 2018
END Date: 
February, 2019

• Prepare Baseline Schedule and update in Primavera P6

 • Cost control and Budgeting

• Prepare daily, weekly and monthly status reports with S curves phase wise

• Prepare risk register and perform risk analysis

• Invoicing for Work done on monthly basis.

• Prepare Productivity Reports

• Preparing and update Procurement status register, Construction Status register.

• Coordinating Engineering, Procurement and construction activities

• Prepare 90 Days Look Ahead Schedule

• Prepare Commercial Bid Evaluation for vendor finalization.

Experience Hours (Planning & Scheduling): 
650
Experience Hours (Cost Management): 
400

Assistant Manager - Planning Engineer, Housing Development and Infrastructure limited, Proposed Airport Slum Rehabilitation, Mumbai, India, Proposed Residential Apartment - Premier Exotica, Mumbai, India.

START Date: 
February, 2016
END Date: 
July, 2016

Housing Development and Infrastructure Limited, Mumbai, India.                               

Experience Hours (Planning & Scheduling): 
14600
Experience Hours (Cost Management): 
11200

Planning Engineer, DIC-NCC (JV), Rehabilitation & Upgradation of Deesa-Radhanpur Section of NH14 from Km 372.600 to km 458.900 in the state of Gujarat, India

START Date: 
July, 2005
END Date: 
September, 2006

Lead the Planning and Billing Department on an Asian Development Bank funded Rehabilitation & Upgradation of Deesa-Radhanpur Section of NH14 from Km 372.600 to km 458.900 in the state of Gujarat, India valued $70m.

Planner & Cost Controller, TATA POWER CO. LTD., 4000 MW Ultra Mega Power Project by TATA POWER, India

START Date: 
December, 2007
END Date: 
August, 2010

The job responsibilities include:

Experience Hours (Planning & Scheduling): 
1900
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
950

Planning & Controls Manager, Self Employed, Construction of Villas (Multi-storied Houses), Hyderabad, Andhra Pradesh, India

START Date: 
October, 1998
END Date: 
July, 2000

PLANNING & CONTROLS MANAGER in Hyderabad, A. P., India

              Projects                                    :       Construction of Villas (Multi-storied Houses), Hyderabad, Andhra Pradesh, India

Senior Manager, KAMAN Holdings Pvt. Ltd. , Design, Statutory Approvals, Pre Construction planning for Projects in Bangalore, India

START Date: 
May, 2007
END Date: 
January, 2008

Planning & Design of Residential and Commercial Buildings in Bangalore. Design Development of three projects which included a commercial building of 30,000 Sq.Ft at Domlur, a residential layout development of 10.45 Acres at Nelamangala (Project Name – Kaman Sunnyvale) and a commercial project of 3,00,000 Sq.ft at Whitefield.

PLANNING MANAER, IRCON INTERNATIONAL LTD, India, JAMMU & KASMIR RAIL LINK PROJECT, SRINAGAR

START Date: 
February, 2004
END Date: 
February, 2007
  • Actively contributed as Member of Core Team, which implemented Primavera-based Project Management Information System (PMIS).
  • As part of the assignment, handled:
    • Training to 74 Engineers on Primavera
    • Creation of Work Breakdown Structures, resources and project activities after discussion with engineers.
    • Project scheduling and reports generation in Primavera.
    • Providing necessary IT support in terms of Software and Hardware.
    • Creating and editing drawings using AutoCAD.
    • Handling maintenance of Computers including Local Area Network for
Experience Hours (Planning & Scheduling): 
1200

Bid/Project Planning Engineer, Abir Infrastructure Pvt. Ltd., 1750 MW Demwe Lower Hydro Electric Project, India

START Date: 
September, 2010
END Date: 
August, 2012
  • Project Planning and Schedule for a Hydro electric Project 
  • Constructional Power Planning & Costing 
  • Planning of the communication systems for a remote location 
  • Planning of the automation of the work and a centralized sub station to monitor the resources(equipment, vehicles, manpower, stores etc.,). 
  • Insurance claims 
  • Project monitoring for a transmission line 
  • Planning of the equipment in respect to power generation and the related equipments along with their automation. 
  • Conveying systems

Market Place