Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Design

Technical Office Engineer, Elsewedy Electric, , Erbil 11, 33, 132 kv substations – Iraq, Metu – Gambela 230 kV power transmission project – Ethiopia, 33/11 KV Substation Indoor & Outdoor – Ghana, Design, Supply and Installation of Substations & Lines – K

START Date: 
February, 2009
END Date: 
February, 2010

Worked in studying the following projects:

 

Pyramids Industrial Parks (PIP) - Egypt

Erbil 11, 33, 132 kv substations – Iraq

Metu – Gambela 230 kV  power transmission project – Ethiopia

33/11 KV Substation Indoor & Outdoor – Ghana

Design, Supply and Installation of Substations & Lines – Kenya

110kV Double circuit OHL from Shoaiba to Jeddah – KSA

Construction Project Planner / Senior Planner, Laing Homes, Pre construction, design, procurement, construction, post construction

START Date: 
October, 2008
END Date: 
October, 2010

As the sole planner my resposibilities were from conception, due diligence, planning, design, procurement, construction and post construction, reporting on a weekly bases as to the condidtion of the projects, in time and cost with resoect to the programme and implications on delay and in front

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
100

Senior Manager, KAMAN Holdings Pvt. Ltd. , Design, Statutory Approvals, Pre Construction planning for Projects in Bangalore, India

START Date: 
May, 2007
END Date: 
January, 2008

Planning & Design of Residential and Commercial Buildings in Bangalore. Design Development of three projects which included a commercial building of 30,000 Sq.Ft at Domlur, a residential layout development of 10.45 Acres at Nelamangala (Project Name – Kaman Sunnyvale) and a commercial project of 3,00,000 Sq.ft at Whitefield.

Lead Planning Engineer, IHC Engineering Business Ltd, Design, Fabrication and Installation of bespoke offshore pipelay equipment

START Date: 
March, 2014

·         Produce tender stage and contract programmes from client specifications

·         Provide planning & resource scheduling support for Project Managers & Engineering design team

·         Produce graphs and S-Curves using Earned Value technique to monitor project progress

Experience Hours (Planning & Scheduling): 
500

Senior Staff Specialist, Electric Boat Corporation, General Dynamics, Engineering, Design, Construction, Test, and Delivery of Submarines to U.S. Navy

START Date: 
September, 1989

Senior Staff Specialist

Direct, manage and maintain project controls and information systems for EB’s Virginia Construction program. 

  • Develop and initiate data exchange and data transactions dealing with production, including scheduling, progress reporting, summarization and earned-value reporting. 
  • Leader for productivity-enhancement projects as part of a yard-wide cost-reduction program generating custom applications for staff providing visibility of current status. 

Specialist for developing applications that

Senior Staff Specialist, Electric Boat Corporation, General Dynamics, Engineering, Design, Construction, Test, and Delivery of Submarines to U.S. Navy

START Date: 
September, 1989

Senior Staff Specialist

Direct, manage and maintain project controls and information systems for EB’s Virginia Construction program. 

  • Develop and initiate data exchange and data transactions dealing with production, including scheduling, progress reporting, summarization and earned-value reporting. 
  • Leader for productivity-enhancement projects as part of a yard-wide cost-reduction program generating custom applications for staff providing visibility of current status. 

Specialist for developing applications that

Associate Planning Engineer, Procon Energie LLC, Design, Fabrication and Construction of Diesel Storage Tanks

START Date: 
January, 2013

As a Planning/Scheduling/Costing Engineer for an EPCF&I concern, my roles and routines includes but not limited to:

Graduate Geotechnical Engineer (Projects), Amey, •Planning, Design, Construction and Installation of numerous Closed Circuit Television (CCTV) and Variable Massage Signs (VMS) Foundations across Scotland, United Kingdom.

START Date: 
June, 2008
END Date: 
December, 2010
  • Planning full scope of Geotechnical Engineering projects, using Microsoft Project or Primavera software;
  • Updates primavera with all approved update project information and perform quality checks on logic and dependencies/constraints on the project activities;
  • Prepare Health, Safety and Environment Plan for Proposed Geotechnical Engineering Projects;
  • Conduct Slope Stability Analysis and Design remediation for unstable slopes, landslides for engineering projects, using OasysGeo or Geostudio 2007 Software;
  • Calculate  Bearing Capacity and Sett

Market Place

No results found... (try selecting a different content filter)

Syndicate content