East London Line

Forensic Delay Analyst, BALFOUR BEATTY, East London Line

START Date: 
October, 2010
END Date: 
July, 2011

Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.

Engineer, Faber Maunsell AECOM, Taylor Woodrow, East London Line, 2nd Stage Enabling Works - Kingsland Road Bridge (rail underbridge) Inspection for Assessment

START Date: 
September, 2005
END Date: 
October, 2005

Inspection for assessment of Kingsland Road Bridge, a steel truss bridge in Shoreditch. The bridge soffit was inspected during night-time road closures from a mobile elevated working platform.

Planning Engineer, Mott MacDonald, East London Line

START Date: 
December, 2007
END Date: 
June, 2009

 

2007 – 2009             Planning Engineer

 

Role as a planning engineer for Mott MacDonald (using P6 software) supporting bids/projects on the East London Line development and Crossrail.

Major Projects Planner, Downer EDI, Hamilton Ring Road

START Date: 
January, 1996
END Date: 
January, 2011

Currently working as a Major Projects Planner for Downer EDI in New Zealand. Main focus at the moment is to develop planning into its own entity as part of the projects life cycle.

Senior Planner, Balfour Beatty Civil Engineering, East London Line

START Date: 
February, 2007
END Date: 
September, 2007

East London Line Extension. Value £360 million for Transport for London. Upgrade and extension of the existing East London Line Railway. Responsible for the construction planning for 2 of the 3 sections. Work included civil structures, depot construction, permanent way, signalling, telecoms & power.

Experience Hours (Planning & Scheduling): 
1400