Project Controls Supervisor

Project Controls Supervisor, Jacobs Canada Inc., O&G EPC and Construction

START Date: 
May, 2011
END Date: 
August, 2013

·         Led the scheduling team for monitoring/controlling of O&G project with TIC $1.BM;

·         Developed the resource loaded schedule for O&G EPC project with TIC $1.5B;

·         Led the scheduling team (5 Senior Scheduler) for a Program with TIC $180M;

·         Directly managed the master construction schedule (3 contractors) with TIC $120;

Project Controls Supervisor, Tengizchevroil LLP, Tengizchevroil LLP – Sulphur Expansion Project

START Date: 
May, 2008
END Date: 
August, 2007
Establish the Phese 2 schedule and maintain progress. Establish the schedule for full project execution at Level 2 and the detailed Phase 2 / Phase 3 ‘Gate’ schedule, to allow funding to be established for Phase 3 of the Project. Was promoted to Project Controls Supervisor and was respsponsible for recruiting my back-to-back replacement, 2 Cost Control Supervisors and for establishing an integrated Cost / Scheduling and Estimating Work/Cost Breakdown structure to take the Project through full execution.

Project Controls Supervisor, Tengizchevroil LLP, Tengizchevroil LLP – Sulphur Expansion Project

START Date: 
May, 2008
END Date: 
August, 2007

Establish the Phese 2 schedule and maintain progress. Establish the schedule for full project execution at Level 2 and the detailed Phase 2 / Phase 3 ‘Gate’ schedule, to allow funding to be established for Phase 3 of the Project. Was promoted to Project Controls Supervisor and was respsponsible for recruiting my back-to-back replacement, 2 Cost Control Supervisors and for establishing an integrated Cost / Scheduling and Estimating Work/Cost Breakdown structure to take the Project through full execution.

Project Controls Supervisor, Carter Brothers, CDC

START Date: 
August, 2005

 

 

  • Performs complex evaluations of existing procedures, processes, techniques, models and/or systems related to management problems or contractual issues.
  •  

     

     

     

  • Develops work breakdown structures, prepares charts, table, graphs and diagrams to assist in analyzing problems.
  •  

     

     

     

  • Assists in the preparation of management plans and reports.
  •  

     

     

    &nbsp

    Project Controls Supervisor, Jacobs Engineering Inc USA, Acceler8 Program; South Florida Water Management District

    START Date: 
    August, 2004
    END Date: 
    October, 2008
    Provided project controls and scheduling support to the Acceler8 Program as part of the Program Management/Construction Management joint venture. Following that contribution, client requested further services as Program Lead and Subject Matter Expert for their SAP Project System (PS) implementation and as SAP PS instructor for their enterprise rollout.
    Experience Hours (Planning & Scheduling): 
    7000
    Experience Hours (Cost Management): 
    1000
    Experience Hours (Forensic Analysis): 
    500