Assistant Construction Planner/Scheduler; Maintenance Planner

Assistant Construction Planner/Scheduler; Maintenance Planner, BPXA, Activity Planning

START Date: 
November, 2007
END Date: 
June, 2016

BPXA

Scheduler on the North Slope, Prudhoe Bay, Alaska.

Scheduled Facility Maintenance in P6 for Activity Planning program.

Integrated Projects with Facility Maintenance and 3rd Party contractors.

North Area Scheduer for four Assets in Prudhoe Bay.

Performance Planning Team Lead for Integrated Facility Planning initiative.

Experience Hours (Planning & Scheduling): 
16000

Assistant Construction Planner/Scheduler; Maintenance Planner, Fortunato engineering., %26 Power infrastructure works

START Date: 
May, 2011
END Date: 
November, 2011
Preparing and updating schedule in MS Project, controlling work activities, earthwork and soil compaction, asphalt paving and weekly reports, monthly and photo of the work report, MSProject system. Design and implementation of field Dry Port in Itapoa SC.
Experience Hours (Planning & Scheduling): 
1200
Experience Hours (Cost Management): 
550
Experience Hours (Forensic Analysis): 
600

Assistant Construction Planner/Scheduler; Maintenance Planner, EIA XXI - Repsol, SKR01 SKSOL LUBE BASE OIL COMPLEX

START Date: 
September, 2012

Assigned to SKSOL, a joint venture of REPSOL S.A. (Spain) and SK Lubricants (Republic of Korea), to schedule the construction of a new lubricant plant, including two process units, an onsite tanks area and a seaside tanks area, reporting to the Organization Project Management Team

Assistant Construction Planner/Scheduler; Maintenance Planner, EIA XXI - Repsol, SKR01 SKSOL LUBE BASE OIL COMPLEX

START Date: 
September, 2012

Assigned to SKSOL, a joint venture of REPSOL S.A. (Spain) and SK Lubricants (Republic of Korea), to schedule the construction of a new lubricant plant, including two process units, an onsite tanks area and a seaside tanks area, reporting to the Organization Project Management Team

Assistant Construction Planner/Scheduler; Maintenance Planner, EIA XXI - Repsol, SKR01 SKSOL LUBE BASE OIL COMPLEX

START Date: 
September, 2012

Assigned to SKSOL, a joint venture of REPSOL S.A. (Spain) and SK Lubricants (Republic of Korea), to schedule the construction of a new lubricant plant, including two process units, an onsite tanks area and a seaside tanks area, reporting to the Organization Project Management Team

Assistant Construction Planner/Scheduler; Maintenance Planner, EIA XXI - Repsol, SKR01 SKSOL LUBE BASE OIL COMPLEX

START Date: 
September, 2012

Assigned to SKSOL, a joint venture of REPSOL S.A. (Spain) and SK Lubricants (Republic of Korea), to schedule the construction of a new lubricant plant, including two process units, an onsite tanks area and a seaside tanks area, reporting to the Organization Project Management Team

Assistant Construction Planner/Scheduler; Maintenance Planner, EIA XXI - Repsol, SKR01 SKSOL LUBE BASE OIL COMPLEX

START Date: 
September, 2012

Assigned to SKSOL, a joint venture of REPSOL S.A. (Spain) and SK Lubricants (Republic of Korea), to schedule the construction of a new lubricant plant, including two process units, an onsite tanks area and a seaside tanks area, reporting to the Organization Project Management Team

Assistant Construction Planner/Scheduler; Maintenance Planner, ABV ROCK GROUP KB, SAUDI STRATEGIC PROJECT SITE 7

START Date: 
June, 2003
END Date: 
July, 2006
  • Construction Planner/Scheduler - Construction Phase
  • Prepare construction and installation schedules of the project using Primavera Project Planner (P3) in compliance with the project requirements.
  • Resource loading and leveling of construction schedule by integrating the appropriate manpower requirements for each discipline relative to the overall project needs.
  • Coordinate with Procurement for the delivery and installation of all critical mechanical and electrical equipment.
  • Perform schedule analysis and studies problem areas to identify, monitor and high

Assistant Construction Planner/Scheduler; Maintenance Planner, Quadriga, PKCT

START Date: 
January, 2007

Client - Project Planning and mangement of contract schedule and in-house team on a construction Site