Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Morgan Sindall Infrastructure

Summer Placement Student, Morgan Sindall Infrastructure, Taxiway and Cul-De-Sac Reconstruction (£3.1 m)

START Date: 
July, 2013
END Date: 
September, 2013
Designed a Digital Terrain Model for surveying, setting out and automatic grade control to concrete paving.Processed material reconciliations to monitor imports, exports and wastage.Completed site measures to aid project team members.

Graduate Engineer, Morgan Sindall Infrastructure, Runway Rehabilitation (£31 m)

START Date: 
September, 2014
END Date: 
October, 2014
Assisted project engineers and site management team during night shifts.Completed commissioning and handover documentation.Managed and ensured all snagging works were being completed to acceptable standards by subcontractors.

Graduate Engineer, Morgan Sindall Infrastructure, Terminal 4 Code F Stands (£10m)

START Date: 
October, 2014
END Date: 
December, 2014
Supervised and managed sub-contractors in completing finishing works to successfully handover stands.Booked and maintained detailed records for the site diary.Liaised with end users and stake holders within operational and airline teams.

Graduate Engineer,, Morgan Sindall Infrastructure, Sierra Taxiway Realignment (£20m)

START Date: 
December, 2014
END Date: 
September, 2015
Graduate Engineer, Sierra Taxiway Realignment (£20m) Raised, priced and agreed compensation events.Provided operatives and management with technical assistance.Presented company and project specific inductions.Proposed engineering solutions to problems on site and seeking approval from designers.Compiled information for issuing early warnings and site measures of additional work.Completed quality assurance and non-conformance reports to comply with management systems.Attending planning meetings an

Project Controls Engineer, Morgan Sindall Infrastructure, Heahthrow Q6 / Q6+1 Framework

START Date: 
September, 2015
Working with project teams to maintain project schedules in line with contract requirements.Producing monthly EVM reports for internal and external stakeholders.Carrying out WBS-CBS mapping to incorporate in performance measurement baselines.Establishing control accounts plans to define the responsibility, scope, and earned value techniques.Producing time phased planned value curves against the contract program and budgets.Monitoring Risk to track position of contract risk allowances, spend and release.Maintained WBS change

Senior Planner, Morgan Sindall Infrastructure, Heathrow Airport Limited

START Date: 
January, 2019

I am a Senior Planner working on Water Projects (Firemain, External Potable Water, Internal Potable Water and Drainage Infrastructure Renewal).

  • Prerpare baseline programmes.
  • Update programmes periodicly.
  • Prepare tender programmes.
  • Implement Project Controls by using Earned Value Management.
  • Prepare EOT by applying Time Impact Analysis method.

Ziad Beydoun

First Name: 
Ziad
Last Name: 
Beydoun

I have more than eleven years of experience in buildings and townships, networks infrastructure and earthwork. My involvement extends to Project management in the capacity of planning, controlling and monitoring of projects according to their contractual obligations on time, within the policies, programme and budget.

 

My skills set includes but is not limited to:

Professional Since: 
Nov-2007 (17.1 yrs experience)
Oldest experience: 
Nov 2007 (17.1 yrs experience)
Years Experience: 
11

Mike Neumann

First Name: 
Mike
Last Name: 
Neumann
Professional Since: 
Aug-1988 (36.4 yrs experience)
Years Experience: 
0

Craig James

First Name: 
Craig
Last Name: 
James

A Senior Commercial Manager, working for Morgan Sindall, within their Aviation division, based at Heathrow Airport

Professional Since: 
Jan-1996 (29.0 yrs experience)
Years Experience: 
0

Andrew Swann

First Name: 
Andrew
Last Name: 
Swann

Started as Graduate Engineer in 2003 and worked up a career path to Project Manager in 2014.  Project Manager to date on airfield civils projects at Heathrow.

Skills in:

PQC,

NEC contract,

Negotiation,

Engineering,

People Management,

Project Controls,

Project programming,

Project pricing,

Professional Since: 
Sep-2003 (21.3 yrs experience)
Oldest experience: 
Oct 2014 (10.2 yrs experience, WARNING: 11.1 years variance with Professional Since)
Years Experience: 
3

Market Place

No results found... (try selecting a different content filter)

Syndicate content