Responsible for managing the function of planning, scheduling, progress monitoring, prioritization of jobs, material controlling and document controlling.
Preparation of level 3 & 4 schedules, Resource Histogram (manpower/time), “S” Curves, integrate subcontractor/in-house detailed Level 4 schedule, Mobilization Schedule, look ahead schedule by adopting CPM technique.
Preparation of construction reports of internal/subcontractor/client daily, weekly, monthly reports, Schedule analysis, Performance/Productivity status report, critic