As Field Planning Scheduling Engineer for Qatar Gas LAFFAN Refinery Project, at Ras Laffan Industrial City, State of Qatar.
• In charge for the preparation and verification of Project General Base line Schedule (PERT / CPM) from Engineering Design, Procurement, Construction, Commissioning to Start up utilizing PRIMAVERA PROJECT PLANNER with the proper allocation and distribution of Quantity, Cost, Man-hours and Equipment, Activity inter-relationship logic and Construction Methodology sequence as being prepared by the General Contractor.