2001 to date Alstom Power - Lead Planner for a number of years working on UK and overseas projects. From design & supply projects to major ’Turnkey’ Projects for the build of new gas and oil fired stations to Biomass co-firing projects and Capacity increase Projects. Experience of planning with coal power station projects. Specific projects are Arnot Power Station Capacity Increase project (Euros 36.233M) in South Africa, Drax Power Station Biomass co-firing project (£48.28M).
Planning, management and programme co-ordination of contractor’s / client’s networks and progressing and reporting against detailed procurement, construction, fit-out and commissioning programmes. Review, co-ordination and control of technical contractor’s outline and detail design programming requirements.
I was the lead Planner for Willmott Dixon Dartford. I was responsible for 3 planners, and carried out tender and site planning. Our main area of experience was the education sector.
Currently working on a heavy civils project based in Beckton East London. My role is as Lead Planner managing a team of 4, work consists of four 80 meter shafts, tunnels connecting to shafts and two culverts leading too and from the River Thames. 635 million pound project overall.
Senior Schedule Analyst appointed as a Sub-Consultant working with the Clients Project Manager and Project Controls Engineer, as well as RBP’s Claims QS to make a chronology and feed data into a delay and disruption analysis for incorporation into an EOT claim narrative. This role was UK based, with visits to Japan when necessary.