END Date:
September, 2004
• Abu Aisha Water Pipeline and Irrigation Project Phase II, Construction of the irrigation system of a 100 km² agricultural area with 40 km. ductile iron pipe, 310 km. uPVC pipe, 830 R/C chambers, 12,500 valves, 330,000 m³ excavation, 375,000 m³ backfilling