Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Risk

student, BETCHEL, Cairo Festival City

START Date: 
January, 2009
END Date: 
July, 2013

Student, please let me pass to the site, please, I am just a Student

student, BETCHEL, Cairo Festival City

START Date: 
January, 2009
END Date: 
July, 2013

Student, please let me pss to the site, please, I am just a Student

Student

Student

Student

Student

Student

Student

Student

Student

Student

Student

student, BETCHEL, Cairo Festival City

START Date: 
January, 2009
END Date: 
July, 2013

Student, please let me pss to the site, please, I am just a Student

Student

Student

Student

Student

Student

Student

Student

Student

Student

Student

PLANNING ENGINEER, GEC Qatar, Samrya Hotel Suites (B3+G+M+44)

START Date: 
January, 2012
  •  Preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of work in Primavera 6.
  • Complete resource planning including labour & non labour (Machinery) as per project scope using productivity norms.
  • Coordinate between client & consultants for various issues at site regarding work progress & for issues impacting activities on the critical path.
  •  Review & analysis of Contract documents for each Constr

EPC Senior Planner, Nurol LLC, Villas, School

START Date: 
July, 2007

v  Qualified Planning Engineer with around 6 years of experience in Project Management, Project Proposal, Construction Management, Resource Planning, Business Development and Cost Control with organization of repute in India and UAE.

Currently Associated with Nurol LLC, Abu Dhabi, UAE

Planner, Tecnicas Reunidas, & Oil & Gas Projects

START Date: 
April, 2011

Working in Técnicas Reunidas S.A. since April 4th, 2011.Planning and Project  Control Department. Development and control Civil, Piping and Mechanical Equipment disciplines plans for different downstream EPC projects located in Europe (HDS, SDA, MHCF Units and revamping activities). Develop and control of the procurement cycle for equipment and bulk material using Primavera P6 and Smart Plan Materials. Perform analysis of engineering works and develop further strategies to improve the efficiency of the project.

Planning and Project Control, PGFK, South Pars Gas Field Development, Phase 22-24

START Date: 
August, 2011

 

I am in charge of Scheduling and Project Control, Besides developing the time schedule Plan of the project in Cooperation with our Engineering Department.

Planning and Project Control, PGFK, South Pars Gas Field Development, Phase 22-24

START Date: 
August, 2011

 

I am in charge of Scheduling and Project Control, Besides developing the time schedule Plan of the project in Cooperation with our Engineering Department.

Planning and Project Control, PGFK, South Pars Gas Field Development, Phase 22-24

START Date: 
August, 2011

 

I am in charge of Scheduling and Project Control, Besides developing the time schedule Plan of the project in Cooperation with our Engineering Department.

Planning Manager, Fluor - Jacobs - DPS - BPSL, TMF Project

START Date: 
June, 2013

Planning Manager

40 years E&C experience on major projects in various sectors for blue chip clients, consultants and contractors.

Currently employed on safety critical project for a FOAK water outage inspection and repair.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content