Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

BECHTEL

A A

First Name: 
A
Last Name: 
A
Professional Since: 
Aug-1998 (26.3 yrs experience)
Years Experience: 
0

Mark Horsall

First Name: 
Mark
Last Name: 
Horsall

Many various planning softwares.  Primavera, Microsoft, Artemis, and older.

Computer Maintenance, spreadsheets, office programs.  Often Linux nowadays.

Professional Since: 
Jan-1990 (34.9 yrs experience)
Oldest experience: 
Apr 1990 (34.7 yrs experience, WARNING: 0.2 years variance with Professional Since)
Years Experience: 
22

Planner, BECHTEL, Power Station

START Date: 
April, 2009

This is a short description of your experience Current experience (with no end date) will also update your PP profile data. Power, turbine, generator, boiler.

This is a short description of your experience Current experience (with no end date) will also update your PP profile data. Power, turbine, generator, boiler.

This is a short description of your experience Current experience (with no end date) will also update your PP profile data. Power, turbine, generator, boiler.

Guillermo Jr Pichay

First Name: 
Guillermo Jr
Last Name: 
Pichay

  

 Twenty Five-Years in construction and consulting/management firms from various local & overseas projects on Commercial (Low, Medium and High Rise Buildings), Residential and Institutional structures, Fit-out Architectural and Interior Works, Road network, Viaduct Bridge works & Toll Plazas, Port, Airport Runways & Taxiways, Aircraft Parking Areas, Air Cargo Hub, Water Treatment Plant, Tunnels, Dam, Pipelines, Power Plant Pump Pits, Intake & Dis

Professional Since: 
Dec-1985 (39.0 yrs experience)
Years Experience: 
0

Senior Planning Engineer, BECHTEL, North West Water AMP2

START Date: 
January, 1999
END Date: 
January, 2000

Senior planner for the Water Treatment Works department. Responsible for all Water Treatment projects from Needs, Optioneering through Design and Construction to Commissioning. The preparation of Level 1 Summary and Level 2 Critical Path Networks and Bar charts for Design Development and Construction. Analysis of contractor’s Level 3 and Level 4 design and construction programmes. The preparation of a level 4 progress measurement system to measure design, procurement and construction.

Sam Ardah

First Name: 
Sam
Last Name: 
Ardah

 Led successful project controls teams to manage projects and programs, optimizing project accounting, scheduling, and forecasting using project control standards to achieve project governance and execution within budget, schedule, and quality. Developed various procedures, processes, and reporting structures to view, analyze, and generate communication channels to foresee potential issues.

Professional Since: 
Aug-1983 (41.3 yrs experience)
Years Experience: 
0

Construction Site Planning, BECHTEL, Comalco Special Projects Misc.

START Date: 
January, 2006
END Date: 
July, 2007

Building and developing new and maintaining the existing construction schedules for the current 66 Special Projects for increase and maximisation of plant production.

  • Working in a management team maintaining the schedule requirements of 8 x Site Project Managers.
  • Daily client and contractor interface and schedule review during routine construction and shutdowns.
  • Contribution to weekly and monthly data collection and reporting including forecasts and trends.
  • Taking weekly progress photos, editing and issuance thereof a

Construction Site Planning, BECHTEL, Yarwun 2 Alumina Refinery Expansion Project

START Date: 
August, 2007
END Date: 
August, 2009

Building and development of the Bechtel Construction pre-bid Proposal and resourced Construction Execution Schedule with approximately 1,376,583 manhours within a team of planners.

  • After handing over the developed Bechtel Construction schedule to a dedicated contract scheduler for that seperable portion of work scope I resumed my role and duties as Site Project Planner within the EPCM management team for the overall Project Schedule as Principal Contractor.
  • Managing half the awarded Major Contractor Schedules and liaison within EPCM Team

Senior Planner, BECHTEL, Queensland Curtis LNG Project

START Date: 
October, 2010
END Date: 
September, 2011

Development of Cost Control and Contractor reporting systems until project gained NTP.

  • As I was deployed to the site very early ahead of the LNG Tanks’ commencement I assumed roles of both cost and trends engineer in the field reporting back to Bechtel corporate in Houston, Texas.
  • Job function included tailoring subcontractor reporting formats and monitoring early works subcontractors for marine facilities, site preparation (including clearing and bulk earthworks), camp facilities and Bechtel internal direct hire scope.
  • For the

CHI-YUEN LI

First Name: 
CHI-YUEN
Last Name: 
LI

 

Reviewing designer and contractors programme. 

Assessing compensation events and early warnings and its effects on the contract programme.

Earned value analysis.

Critical path analysis to ensure key activities are identified and tracked to ensure timely delivery of the works.

Managing interfaces between packages to ensure that the required deliverables are provided on-time.

Establishing key interfaces between station and other trades

Professional Since: 
Sep-1993 (31.1 yrs experience)
Oldest experience: 
Oct 2003 (21.1 yrs experience, WARNING: 10.0 years variance with Professional Since)
Years Experience: 
41

Market Place

No results found... (try selecting a different content filter)

Syndicate content