Exterran

Project Manager, Exterran, Oak Grove and CRPs

START Date: 
June, 2012
END Date: 
September, 2013

Responsible for earthwork and construction of the pad (7.1MM cubic yard of earthmovement) and delivery of first 200MMSCFD equipment and balance of plant engineering. Scope managed was Engineering, Procurement, and Construction Management of three trains of 200MMSCFD Cryogenic trains with balance of plant, with planned built-out capacity of 2BSCFD. Key achievement was selection of EPC subcontractors for scope that was not self-performed.

Project Engineer, Exterran, Khor Mor LPG Recovery Plant and Early Production Facility

START Date: 
July, 2009
END Date: 
June, 2011

Delivered a profitable margin on technical construction and commissioning support at site of two identical 150MMSCFD Cyrogenic trains and engineering, procurement and fabrication of EPF plant skids including balance of plant, by leading coordination with client's team in UAE and Iraq, internal engineering team in US and AE, and Construction and Commissioning Manager at site.

Project Engineer and later promoted as Project Manager, Exterran, Majnoon Early Production System

START Date: 
July, 2011
END Date: 
July, 2012

Flawless Project Delivery on the scope of Engineering, Procurement, and Fabrication for skid mounted packages and modules for two identical 50KBOPD trains,with common facilities, and utilities to form Well pad and part of Central Processing Facilities.

Lead Planning Engineer, Exterran, Shell Iraq Majnoon Oil & Gas Separation plant

START Date: 
March, 2011
END Date: 
December, 2011

Lead Planning Engineer (Eastern Hemisphere)

Managing a team of 8 planning engineers in head office and project sites.

George Kavalakkattu

First Name: 
George
Last Name: 
Kavalakkattu
Professional Since: 
Nov-2012 (12.1 yrs experience)
Years Experience: 
0

EMMANUEL OFOH

First Name: 
EMMANUEL
Last Name: 
OFOH

Experienced Electrical and Instrumentation Engineer possessing a broad technical background in Electrical, Instrumentation, Control, Electronics, Automation,Project Engineering and Project Management in the Oil & Gas, manufacturing and service industries.

I have over seven (7) years hands-on technical/engineering experience in Oil and Gas process plants and manufacturing plants Instrumentation, Production Operations/Maintenance.

Professional Since: 
Jan-2006 (19.0 yrs experience)
Oldest experience: 
Jan 2006 (19.0 yrs experience, WARNING: 0.0 years variance with Professional Since)
Years Experience: 
41

Lead Electrical and Instrumentation/Control, Exterran, Gbaran-Ubie EPF (GAS Processing Facility)

START Date: 
January, 2006
• System Integration for Plants, Equipment and Machines DCS/PLC/SCADA/HMI/F&G.


• E&I Systems Design and Implementation

• Installation, Testing, Commissioning and Maintenance of Electrical and Instrumentation systems for Process plants, Compressors, Turbines, Motors, and Generators.

• E&I devices/system Testing, Inspection and QAQC.

• Project Engineering and Project Management

• Production Operations

• Radiation Safety/HSE

Exterran Planner

START Date: 
September, 2009
     Establish the overall baseline schedule in P6 with client approval for base lining.
     Update and maintain the schedule. Generate weekly forecast schedule update report and three week look-ahead construction schedule.
     Prepare weekly schedule analysis report and progress reports with S-Curves for engineering, procurement, construction and commissioning.

Exterran Planner

START Date: 
April, 2008
Current Role

Ahmed Ali

First Name: 
Ahmed
Last Name: 
Ali
Professional Since: 
Jul-1996 (28.4 yrs experience)
Oldest experience: 
Apr 2008 (16.7 yrs experience, WARNING: 11.7 years variance with Professional Since)
Years Experience: 
0