How to get % Planned for the baseline ?

15 replies [Last post]
Sandip Chakraborty
User offline. Last seen 9 years 29 weeks ago. Offline
Joined: 9 Oct 2006
Posts: 9
Groups: GPC Qatar
Hi,

Need a help.....

Wanted to know.... how can we get the % Planned for the baseline prog at any given data date .....

Regards

Sandip

Replies

Safak Vural
User offline. Last seen 4 years 23 weeks ago. Offline
Joined: 12 May 2008
Posts: 117

 

Dear planners,

If you are not using resource curves, fancy calendars and your activity durations are not high, then you can use a custom data item and global changes formula below to have an approximate planned % for activity for schedule layouts.

Custom Data Item: PL%

GC1

PL% = (DD – PLST) / (PLFN – PLST)*100

GC2

If PL% < 0 then PL% = 0

GC3

If PL% > 100 hen PL% = 100

Assign a letter (“P” maybe) in tools-tabular reports-production

Assign PL% to a column in your layout. After every update run report series “P” and reorganize your layout.

I recommend having a second target and updating it manually which is much more accurate (This method neglects resource profile distortion due to calendars) but this is a quick solution. This algorithm can be also used in report writer and other stuff to have planned % for an activity for a specific data date.

Regards,

Safak

 

john Cohello
User offline. Last seen 10 years 28 weeks ago. Offline
Joined: 7 Feb 2011
Posts: 15

It stands for Actual cost of work scheduled.Its self explanatory .

BONG YAGAHON
User offline. Last seen 1 year 6 weeks ago. Offline
Joined: 5 Oct 2009
Posts: 43

 

Gentlmen,

Its very simple. Here's how to generate % planned for each activity.

  There are two schedules that you are actually managing in any given project who uses P3. First is the Baseline Schedule also known as theTarget schedule and the second is the Actual Schedule also known as the Current Schedule. In other words, your target/baseline schedule is your PLAN and the current schedule is your ACTUAL and FORECAST schedule. BEfore the DATA DATE your Actual Schedule  and after the DATA DATE your forecast schedule So, below are the steps, just follow the following:

            1. Close the current schedule and open the target schedule by clicking file, open and then click the file name of the target schedule in the file opening dialogue box.

            2. Once the file opens, click Tools> update progress and enter the data date, Then choose all activities and click UPDATE.

            3. After the progress was updated, click format column tool bar, and add a column named Percent Complete.

            4. On this column the percent complete of every activity will appear. Since this is you target SCHEDULE or YOUR PLAN SCHEDULE, every percent COMPLETE therefore that appear on every activity is the % plan of every activity on this DATA DATE.

Hope this help. GOod Luck.

 

Pio

  

BONG YAGAHON
User offline. Last seen 1 year 6 weeks ago. Offline
Joined: 5 Oct 2009
Posts: 43
<
Francois Holtzhausen
User offline. Last seen 13 years 36 weeks ago. Offline
Joined: 23 Mar 2011
Posts: 2
Groups: None

Good day

 

Do any one have a formula for plan%

thank you

Zq qz
User offline. Last seen 12 years 46 weeks ago. Offline
Joined: 6 Jun 2003
Posts: 163
Groups: None
If your schedule is resource loaded.

say cost: review your EVMS. Also you can generate in your resouce loading using cost.(use your baseline to generate this)

if using Manhours/mandays and its loaded in the BQ. lso you can generate in your resouce loading using resource.
mimoune djouallah
User offline. Last seen 5 years 19 weeks ago. Offline
Joined: 14 Oct 2006
Posts: 388
Review earned value

The Budget Summary form displays the planned value (BCWS) and earned value (BCWP). In earned value analysis, you can compare BCWP to the BCWS and to
the actual to date (ACWP).
The planned value reflects the work that should have been finished as of the data date according to the target plan; earned value measures the value of the work
actually accomplished as of the data date. The difference between these two figures is called schedule variance (favorable if the earned value exceeds the
planned value). The difference between ACWP and earned value is called cost variance (favorable if the earned value exceeds the actual cost).

copy past from P3 help ;)

regards
mimoune
Althaf Mohamed
User offline. Last seen 1 year 35 weeks ago. Offline
Joined: 1 Jan 2009
Posts: 11
Groups: None
hi All,


Can anybody tell me What ACWS means Actual Cost of Work Scheduled.


PLZ do let me know if there is any thing like ACWS
Althaf Mohamed
User offline. Last seen 1 year 35 weeks ago. Offline
Joined: 1 Jan 2009
Posts: 11
Groups: None
How do i calculate planned % of an activity (Based on what). is it Quantum of work ,Manhours, Cost or Duration.
Mohammed Foudeh
User offline. Last seen 7 years 31 weeks ago. Offline
Joined: 15 Apr 2005
Posts: 25
Dear all :

to get the accurate Planned % you have your schedule loaded with manhrs..then go to tools/reports/resources/tabular ..and choose all the resources,export this file to excel,then find your planned percentage by dividing the early usage(Cumm.) by the total man hrs then multiply by 100 %,you will get your planned percentage accurately based on physical progress,,also you can find the planned % for late schedule in the same way.

Sandip Chakraborty
User offline. Last seen 9 years 29 weeks ago. Offline
Joined: 9 Oct 2006
Posts: 9
Groups: GPC Qatar
Thanks a lot David...Got it now....
David Kelly
User offline. Last seen 2 years 17 weeks ago. Offline
Joined: 19 Oct 2004
Posts: 630
Gosh, thought everybody knew how to do this.

Take a copy of your project with no progress, a copy of the original baseline will do.

Then progress that project using the "update progtress" facility to the current data date. That means that every activity in the project will have a percent complete as if the project had been executed exactly as the baseline proposed.

Now make that project a Target, e.g. Target 2, of the current plan.

The field "Target 2 percent complete" is Planned percent complete.

Karim Mounir
User offline. Last seen 10 years 16 weeks ago. Offline
Joined: 5 Apr 2006
Posts: 314
Groups: None
Sandip,

actually i don’t know about the % planned which is automatically generated in MSP.

What i meant is that u have to monitor the actual progress in the same way u have planned for.

eg. if u want to monitor progress based on "Units of measure" then u have to load your baseline & updated schedule with the same "Units of measure".
Then after u completed your baseline u make for example S-Curve or a report for some activities having same "Units of measure" which will give u the planned % at a certian data date.
Sandip Chakraborty
User offline. Last seen 9 years 29 weeks ago. Offline
Joined: 9 Oct 2006
Posts: 9
Groups: GPC Qatar
Hi Karim,

What i was asking was can P3 generate on its own the % Planned for each activity as per the baseline schedule ? Like MSP can do ?

Actual progress i will feed manually .....Hope am able to make my question clear to you ....

Regards

Sandip
Karim Mounir
User offline. Last seen 10 years 16 weeks ago. Offline
Joined: 5 Apr 2006
Posts: 314
Groups: None
Sandip,

It depends on the method that u will use to measure the actual progress % (eg. u will measure the actual progress in the same way u will measure the planned progress of the baseline).

Regards.