Average schedule summary times for Design, Procurement, Construction for average buildings - like a school or school add-on

1 reply [Last post]
John Reeves
User offline. Last seen 7 weeks 3 days ago. Offline
Joined: 10 May 2013
Posts: 343
Groups: None

Average schedule summary times for Design, Procurement, Construction for average buildings - like a school or school add-ons.  Should this information be somewhere, such as in Gordian or something...crew counts would be good, but that might be asking for too much...

Replies

Zoltan Palffy
User offline. Last seen 8 weeks 58 min ago. Offline
Joined: 13 Jul 2009
Posts: 3089
Groups: None

I do not think that there is such a thing since each design is different the site is different. There maybe something based on square footage that you cna use but I dont know of any.

The closet thing would be something like an estimating program like  timberline, richardsons, etc

for actual production rates there is a tab uptop of this page labeled as production rates