I have 2 projects open with 2 different data dates.

J
John Reeves 👤 Member for 13 years 2 months

I have 2 projects open with 2 different data dates.  I am sliding a bar in the 2nd one but my Duration at completion is not coming out right - or to fix that the dates are not correct.  I have checked the calendars - could it be because of the data dates?  I don't see what that has to do with it but I don't know what else it could be.  I tried it actualized in the future and un-actualized.  mystery...it is not off by the difference in data dates....

J
John Reeves 👤 Member for 13 years 2 months

I think the issue must have something to do with the Calendar "days" actually being hours -  the cal. came from a contractor so not yet about it, but I sustpect.  My 256 days slid 6 months does not match the dates of these 256 days later - per outside checks...

J
John Reeves 👤 Member for 13 years 2 months

I think the issue must have something to do with the Calendar "days" actually being hours -  the cal. came from a contractor so not yet about it, but I sustpect.  My 256 days slid 6 months does not match the dates of these 256 days later - per outside checks...

J
John Reeves 👤 Member for 13 years 2 months

I think the issue must have something to do with the Calendar "days" actually being hours -  the cal. came from a contractor so not yet about it, but I sustpect.  My 256 days slid 6 months does not match the dates of these 256 days later - per outside checks...

Featured Partner

Top Posters

Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts
Philip Assou-Dodji
1 posts
jeoffrey reyes
15 posts
markg
0 posts
Manjeet Yadav
0 posts
Pan
0 posts
Tijo Kurian
11 posts
Zainab El-Beialy
3 posts