Hi
I need solution for this problem in Primavera.
This is related to Manufacturing Planning works.
Activity A - Machining
Activity B - Machining
Activity C - MAchining
Activity D - Machining
Activity E - Machining
Activity F - Machining.
Machining operation will be done by any on of the machines ( Lathe 1 , Lathe 2 , Lathe 3). After proper link , whether in primavera possible to assign the machines to the activities based on operation which gives better result.
Any one help.
Regards
Ram
Hi
I need solution for this problem in Primavera.
This is related to Manufacturing Planning works.
Activity A - Machining
Activity B - Machining
Activity C - MAchining
Activity D - Machining
Activity E - Machining
Activity F - Machining.
Machining operation will be done by any on of the machines ( Lathe 1 , Lathe 2 , Lathe 3). After proper link , whether in primavera possible to assign the machines to the activities based on operation which gives better result.
Any one help.
Regards
Ram