Shutdown/Project Scheduler, Shell Refining Co. Fom. Bhd, 2010 Inplot Mini Shutdown, 2011 Major Turnaround, 2011 MAB Pit Stop Shutdown
START Date:
June, 2009 Current Role:
- - Responsible in Planning/Schedule Development stage for Shutdown/Turnaround
- - Develop Integrated Execution Schedule – Structure
- - Develop Code Structure in P3E as per system - Systemisation Structure
- - Data entry / import of detail job plans and estimates into scheduling tool.
- - Create logical network of activities and, ultimately, a critical path of work and schedule, without overly constraining the schedule.
- - Updates schedule as required – typically daily or shiftly - based on planner reported progress.
- - Enters job plan details, including activity description, duration, craft and hours, equipment and materials required
- - Determines activity relationships and create logistical ties based on other turnaround planner personnel input (coordinators and planners)
- - Communicates key issues and risks to the T/A Block Coordinator
- - Develops critical path and analyzes for logic discrepancies
- - Provides a critique of turnaround activities after completion of project, participates in Lessons Learned and Lookback process.
- - Inputs updates into schedule as required based on reported progress (field craft, planner, or coordinator).
- - Maintain log of additional work and ensures that it is planned, scheduled, and tracked during execution.
- - To look for opportunities to reduce turnaround scope, and plan and execute with low cost mindset.
- - Review the final workpack from the main contractor and make sure it meets the client guidelines
- To Complete a Turnaround duration, emergent work & etc summary for management reviewing.
Project History:
- 2010 Mini Shutdown (SHELL)
- 2011 Major Turnaround (SHELL)
- 2011 MAB Pit Stop (SHELL)