Senior Planning Engineer, National Iranion Oil Company, Petropars Gas Field development Phase 22-24

START Date: 
June, 2013
END Date: 
April, 2015

 

·            Served as a Planner, Scheduler & Controller of major civil & structural works

·            Developing detailed analysis & quantities verification weekly

·            Preparing 2 weeks look ahead for both L3 & L4 Schedules

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
3500
Experience Hours (Forensic Analysis): 
1500

PLANNING & COST ENGINEER, Foresight Management Services, Southern LDZ - Small Projects, Scotland NT&T - Gas Pipelines, Scotland NT&T - Compressor Station, Scotland LDZ - Pipeline Diversoin

START Date: 
August, 2003
END Date: 
November, 2005

I was part of a management consultancy that supplied Planning, Commercial Risk and Cost Control services for Transco (British Gas), working from home with visits to site and client offices using both Primavera P3 and Microsoft 2000 computer systems, with supporting documentation produced using various Microsoft packages. In this time I have worked on design & construction projects. Responsible for monitoring Design house / MWC programmes for CTR reporting and change control. Updates and reports to the Client detailing change to programme, along with progress and performance.

Experience Hours (Planning & Scheduling): 
2100
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1550

Project Planning Supervisor, Cameron, various projects

START Date: 
August, 2011
END Date: 
October, 2012

-        Supervision of a staff composed by 7 Planners, being responsible for analyze trends and reports to Project Managers, assisting the team on the schedules elaboration and monitoring the EPC planning ensuring quality and consistency.

Experience Hours (Planning & Scheduling): 
2300

Industrial Planning Coordinator, Alstom, various projects

START Date: 
October, 2008
END Date: 
May, 2010

-        Coordinating the Operations Planning includes the entire fabrication chain (oxycutting, heavy plate and welding shop, extra heavy machining shop, assembly and test).

-        Management and implementation of Lean Manufacturing procedures, supporting the Manufacturing stage.

Experience Hours (Planning & Scheduling): 
3000

Senior Planning Engineer, Lagan Construction JV, New Islamabad International Airport

START Date: 
November, 2012

I am working as senior planning engineer on “New Islamabad International Airport”. Main job responsibility is as follows:

Ø  Produced work schedules for Main/Emergency/Secondary Runways, Aprons, Service Roads, Perimeter Track, Underpasses, Bridges, Drainage System, Water Works, Water Supply & Fire Water Piping System (67Km UG Pipeline), Steel Bridges, Sewerage Treatment Plant & Lift Stations

Ø  Gathered/ Analyzed & distributed work performance reports

Experience Hours (Planning & Scheduling): 
2800
Experience Hours (Cost Management): 
1550

Planner - Consultant, Skanska, Bermondsey Dive Under (Part of London Bridge redevelopment)

START Date: 
August, 2013

Providing detailed Planning and Project Controls services within the team constructing the £63m Bermondsey Dive Under project for Network Rail .  Possession and pre possession planning, production and updating of lookahead programmes, cost and resource loaded contract/baseline programmes covering the 5 year delivery plan, quantitative risk analysis programmes, in conjunction with project team members who own delivery.  Analysis of data and compilation and production of 4 weekly reports including key issues / dashboard, EV reports, Cost Forecast, Safety and risk management.  S

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
100

Lead Project Control Engineer, PT Timas Suplindo, All EPC and I project both offshore and onshore.

START Date: 
June, 2013
END Date: 
July, 2014
  • Produce and update the project schedule in coordination with all departments, histograms, and tabular man-hours reports for the project.
  • Involve in FEED Design and tender Stage in collaboration with the engineering team.
  • Establish project governance including all stakeholders and deliver project progress reports, proposals, requirements documentation and presentations.
Experience Hours (Planning & Scheduling): 
15000
Experience Hours (Cost Management): 
14000
Experience Hours (Forensic Analysis): 
150

CONSULTANT PLANNER, Private Company, (various projects)

START Date: 
February, 1994
END Date: 
January, 1999

Consultant Planner, Project Manager providing planning and project management services throughout the construction industry on a wide range of project types including underground station refurbishments, highways works, town centre redevelopment, commercial and residential developments. Clients included main and trade contractors, residential and commercial property developers.

Senior Delay Planning Consultant, BAMN, Blackburn Meadows Power Station

START Date: 
June, 2013
END Date: 
September, 2013

Currently contracted to Systech International in London.

 My current position is as Senior Planner working in Sheffield for 3 months on a new Power plant which is overspent and in Delay. Primarily though I am repsonsible for building up the Delay Analysis for a number of buildings on this civils project. This has meant researching as built data from programmes and site diaries, monthly and weekly meeting reports. I have demonstrated the Planned v As built position for the design and also Construction elements of the project. 

Schedule engineer, GS ENGINEERING & CONSTRUCTION CO, INTER REFINERIES PIPELINE II-PHASE II for TAKREER

START Date: 
February, 2011

The scope of the work include Engineering ,procurement, construction and commissioning and start up for the project.Review current status of both Engineering and Procurement for the Project prepare a revised detailed Level 3 control schedule (Primavera P3) incorporating the physical status and all change orders. This was part of the integrated schedule and network for the EPC contract. Assist the cost engineer in the revised control budget.