Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

analysis

Project Manager, BAE SYSTEMS (SUBMARINES), Maritime Solutions

START Date: 
May, 2012

Over 25 years experience in Planning, scheduling, risk management, SRA and more recently Forensic Analysis and Metric reporting. Role presently involves the evaluation of EVM software and its implementation.

Experience Hours (Planning & Scheduling): 
20000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
5000

Senior Planner / Director, Right First Time Planning Services Limited, Automotive, Construction, Production, Rail

START Date: 
September, 1996

Senior Planning Engineer I am the senior planner on a £114 million upgrade to improve the River Ribble estuary and the coastal environment flood defence project on behalf of United Utilities. This involves building a 3.5 km long storm water storage tunnel in the Preston and Penwortham areas. This will bring significant environmental improvements to the Fylde coast bathing waters and designated shellfish beds located within the Ribble Estuary.

Experience Hours (Planning & Scheduling): 
27600
Experience Hours (Cost Management): 
2650
Experience Hours (Forensic Analysis): 
2750

Senior Project/Program Planner, Iberdrola Engineering&Construction (Scottish Power), Portfolio of Network projects including substation, Overhead Line and U/G Cabling

START Date: 
April, 2012
END Date: 
March, 2014

·         Develop, maintain, monitor and update a multiproject program including Substation and Over head line (OHL) projects

·         Create rolled-up programmes and reports due to the nature of the job (up to 25 projects)

Experience Hours (Planning & Scheduling): 
4000

Type 45 Planning Manager, BVT Surface Ship Solutions, Type 45

START Date: 
May, 2009
END Date: 
December, 2009

Line management responsibility for twelve staff, locations splits between Glasgow (two sites) and Bristol
Manage and maintain T45 programme suite of plans, level 0 to level 2 shipbuild, plus cost control account programming
Key MOD point of contact for all planning queries and activities
Facilitate integration of level 3 to level 2 plans
Selecting new planners to business at interview
What-if analysis and risk mitigation options of all plans level 2 and up
Redesign of WBS, PBS, OBS, and RBS to simplify and set as group standard

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
500

Project Scheduler, APA-Group, Gas Infrastructure

START Date: 
March, 2013

Preparing schedules for new projects, assisting with contractor scrutiny during tender submissions, reviewing schedules for extension of time claims, providing support to PM's on scheduling matters.

Preparing monthly reports for Steering committee.

Being everyone's Bitch - I also help out with construction management and supervision.

Trying to convince people to use a decent scheduling tool like Asta or TILOS, some still think the world is flat!

Experience Hours (Planning & Scheduling): 
20000
Experience Hours (Forensic Analysis): 
4000

Planner, Alstom, AIS-GIS Substations, Compressors

START Date: 
April, 2012

Begginer in Project controls. Working as Planner at Alstom. Project Planning, Scheduling, Analysis, Costing & Reporting

Planning Executive, MMC Gamuda Joint Venture Sdn Bhd., Electrified Double Track Project (Ipoh - Padang Besar)

START Date: 
July, 2010

Responsibilities

1. Support Planning Manager (Overall/Track) and Planning Manager (Infra) with all baselines & forecast planning / interfacing.

Project Management, Multiple, Multiple - Consulting Planner

START Date: 
January, 1983
END Date: 
April, 2008

Enterprise Project Management consulting for 29 years for many clients including Raytheon, Texas Instruments, Petrobras, McAfee, Whitney Bank, Chase Bank, and Centura Bank.

Experience Hours (Planning & Scheduling): 
20500
Experience Hours (Cost Management): 
10000

Lead Scheduler, Gray Research, Missile Defense

START Date: 
August, 1985

Started scheduling with CPM in 1985 (manually).  Started software scheduling in 1987 with Artemis with some small experience with Open Plan.  Began using MS Project in 1997 moving thru each of the versions - 2000, 2003, 2007, and now 2010.  Also have experience with AMS Real Time Project (also known as RTP).

I have worked on schedules a small as 10 tasks to as many as 64,000.  The past few years I have been a part of a proposal team where I created the IMS for the proporsal.  This past year I moved to another job where I evaluate subcontractor schedules (MS

Lead Planner and Package Planner, Black & Veatch, Kusile Power Station

START Date: 
October, 2009
END Date: 
December, 2011

Current Role - Package Planner on Eskom Kusile Power Station in South Africa.  Employed by Black & Veatch.  Project consists of 6x800MW coal-fired units and all BOP elements on a green field site.

Interfaces with Construction and Commercial management staff and with the Controls and Instrumentation contractor.  Reviews contractor programmes, providing feedback to contractor and reporting status to Project.  Develops and inputs logic and status updates for Project Master Programme.  Provides reports and analysis for Project and corporate management.&

Market Place

No results found... (try selecting a different content filter)

Syndicate content