Schedule Setup
Setup Schedule based on Contract WBS in line with company planning policies and guidelines.
Usage of Manpower / KPIs to determine durations of activities and to plan for construction sequencing.
Setup of physical progress measurement using key measurables (Steel Tonnage / Pipe Spools / Cable Length / Termination points etc)
Schedule Analysis and Control / Problem Solving
Conduct weekly analysis of schedule (Float, Critical Path, Manpower, Resource)